A study of stakeholders' procurement deficiencies, delays and cost overruns in Tanzania's construction projects

Q3 Business, Management and Accounting International Journal of Procurement Management Pub Date : 2023-01-01 DOI:10.1504/ijpm.2023.134629
Baraka Israel
{"title":"A study of stakeholders' procurement deficiencies, delays and cost overruns in Tanzania's construction projects","authors":"Baraka Israel","doi":"10.1504/ijpm.2023.134629","DOIUrl":null,"url":null,"abstract":"This article investigates the stakeholders' procurement deficiencies that cause delays and cost overruns in Tanzania's construction projects using a cross-sectional research design and purposive sampling technique. Data were sourced from 126 respondents using a questionnaire. The extent of stakeholders' procurement deficiencies was ascertained by using the significance index. The study found bureaucratic bidding process, frequent order variations, corruption, non-compliance with contractual terms, use of inappropriate procurement methods and inexperienced contractors and consultants as the critical stakeholders' procurement deficiencies facing construction projects. About 52.2% of the surveyed projects revealed cost and time overruns by 29.33% and 33.6% respectively due to one or more stakeholders' procurement deficiencies. This article informs policymakers, scholars and oversight authorities on the stakeholders' procurement deficiencies affecting projects' cost and time which have not been systematically researched in Tanzania. The study's findings are confined to Tanzania's context and thus should not be regarded the same in other places and from non-procurement perspectives.","PeriodicalId":38349,"journal":{"name":"International Journal of Procurement Management","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Procurement Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijpm.2023.134629","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 0

Abstract

This article investigates the stakeholders' procurement deficiencies that cause delays and cost overruns in Tanzania's construction projects using a cross-sectional research design and purposive sampling technique. Data were sourced from 126 respondents using a questionnaire. The extent of stakeholders' procurement deficiencies was ascertained by using the significance index. The study found bureaucratic bidding process, frequent order variations, corruption, non-compliance with contractual terms, use of inappropriate procurement methods and inexperienced contractors and consultants as the critical stakeholders' procurement deficiencies facing construction projects. About 52.2% of the surveyed projects revealed cost and time overruns by 29.33% and 33.6% respectively due to one or more stakeholders' procurement deficiencies. This article informs policymakers, scholars and oversight authorities on the stakeholders' procurement deficiencies affecting projects' cost and time which have not been systematically researched in Tanzania. The study's findings are confined to Tanzania's context and thus should not be regarded the same in other places and from non-procurement perspectives.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
坦桑尼亚建设项目中利益相关者采购不足、延误和成本超支的研究
本文调查了利益相关者的采购缺陷,导致延误和成本超支在坦桑尼亚的建设项目使用横断面研究设计和有目的的抽样技术。数据来自126名调查对象的问卷调查。利用显著性指数确定利益相关者的采购缺陷程度。研究发现,官僚的投标程序、频繁的订单变化、腐败、不遵守合同条款、使用不适当的采购方法以及缺乏经验的承包商和顾问是建筑项目面临的关键利益攸关方采购缺陷。约有52.2%的项目因一个或多个持份者的采购不足而导致成本和时间分别超出29.33%和33.6%。本文向政策制定者、学者和监督当局介绍了利益相关者的采购缺陷,这些缺陷影响了坦桑尼亚尚未系统研究的项目成本和时间。这项研究的结果仅限于坦桑尼亚的情况,因此不应该从其他地方和非采购的角度来看待它。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
International Journal of Procurement Management
International Journal of Procurement Management Business, Management and Accounting-Business, Management and Accounting (all)
CiteScore
2.00
自引率
0.00%
发文量
39
期刊最新文献
Investigating the Relationship Between Green Supply Chain Purchasing Practices and Firms’ Performance We versus you: exploring the extent of gendered language in purchasing and supply management job advertisements A Review of Green Supply Chain Management in the Pharmaceutical Industry Importance of credentials for in-house or outsourced leader appointments in successful versus unsuccessful large public IS contract awards The contribution of the procurement process to financial performance: a case study of the sugar-energy sector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1