A memetic NSGA-II for the multi-objective flexible job shop scheduling problem with real-time energy tariffs

IF 2.5 3区 工程技术 Q2 ENGINEERING, INDUSTRIAL Flexible Services and Manufacturing Journal Pub Date : 2023-11-14 DOI:10.1007/s10696-023-09517-7
Sascha Christian Burmeister, Daniela Guericke, Guido Schryen
{"title":"A memetic NSGA-II for the multi-objective flexible job shop scheduling problem with real-time energy tariffs","authors":"Sascha Christian Burmeister, Daniela Guericke, Guido Schryen","doi":"10.1007/s10696-023-09517-7","DOIUrl":null,"url":null,"abstract":"Abstract Rising costs for energy are increasingly becoming a vital factor for the production planning of manufacturing companies. Manufacturers face the challenge to react to dynamic energy prices and design energy cost efficient schedules in their production planning. In the literature, the energy cost-aware Flexible Job Shop Scheduling Problem addresses minimization of both makespan and energy costs. Recent studies provide multi-objective approaches to model the trade-off of minimizing makespan and energy costs. However, the literature is limited to coarse-grained time periods and does not consider dynamic tariffs where costs change at short intervals, so that production schedules may fall short on energy costs. We aim to close this research gap by considering frequently changing real-time energy tariffs. We propose a multi-objective memetic algorithm based on the non-dominated sorting genetic algorithm (NSGA-II) with both makespan and energy cost minimization as the objectives. We evaluate our approach by conducting computational experiments using prominent FJSP-benchmark instances from the literature, which we supplement with empiric dynamic energy prices. We show results on method performance and compare the memetic NSGA-II with the results of an exact state-of-the-art solver. To investigate the trade-off between a short makespan and low energy costs, we present solutions on the approximated Pareto front and discuss our results.","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":null,"pages":null},"PeriodicalIF":2.5000,"publicationDate":"2023-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Flexible Services and Manufacturing Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/s10696-023-09517-7","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract Rising costs for energy are increasingly becoming a vital factor for the production planning of manufacturing companies. Manufacturers face the challenge to react to dynamic energy prices and design energy cost efficient schedules in their production planning. In the literature, the energy cost-aware Flexible Job Shop Scheduling Problem addresses minimization of both makespan and energy costs. Recent studies provide multi-objective approaches to model the trade-off of minimizing makespan and energy costs. However, the literature is limited to coarse-grained time periods and does not consider dynamic tariffs where costs change at short intervals, so that production schedules may fall short on energy costs. We aim to close this research gap by considering frequently changing real-time energy tariffs. We propose a multi-objective memetic algorithm based on the non-dominated sorting genetic algorithm (NSGA-II) with both makespan and energy cost minimization as the objectives. We evaluate our approach by conducting computational experiments using prominent FJSP-benchmark instances from the literature, which we supplement with empiric dynamic energy prices. We show results on method performance and compare the memetic NSGA-II with the results of an exact state-of-the-art solver. To investigate the trade-off between a short makespan and low energy costs, we present solutions on the approximated Pareto front and discuss our results.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有实时电价的多目标柔性作业车间调度问题的模因NSGA-II
能源成本的上升越来越成为制造企业生产计划的重要因素。制造商面临的挑战是对动态能源价格做出反应,并在生产计划中设计能源成本效率高的时间表。在文献中,具有能源成本意识的柔性作业车间调度问题解决了最大完工时间和能源成本的最小化问题。最近的研究提供了多目标方法来模拟最大完工时间和能源成本之间的权衡。然而,文献仅限于粗粒度的时间段,并没有考虑成本在短时间间隔内变化的动态关税,因此生产计划可能会低于能源成本。我们的目标是通过考虑频繁变化的实时能源关税来缩小这一研究差距。提出了一种基于非支配排序遗传算法(NSGA-II)的多目标模因算法,以最大完工时间和能量成本最小化为目标。我们通过使用文献中突出的fjsp基准实例进行计算实验来评估我们的方法,我们补充了经验动态能源价格。我们展示了方法性能的结果,并将模因NSGA-II与精确的最先进的求解器的结果进行了比较。为了研究短完工周期和低能源成本之间的权衡,我们提出了近似帕累托前沿的解决方案,并讨论了我们的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Flexible Services and Manufacturing Journal
Flexible Services and Manufacturing Journal ENGINEERING, MANUFACTURING-OPERATIONS RESEARCH & MANAGEMENT SCIENCE
CiteScore
5.60
自引率
7.40%
发文量
41
审稿时长
>12 weeks
期刊介绍: The mission of the Flexible Services and Manufacturing Journal, formerly known as the International Journal of Flexible Manufacturing Systems, is to publish original, high-quality research papers in the field of services and manufacturing management. All aspects in this field including the interface between engineering and management, the design and analysis of service and manufacturing systems as well as operational planning and decision support are covered. The journal seeks papers that have a clear focus on the applicability in the real business world including all kinds of services and manufacturing industries, e.g. in logistics, transportation, health care, manufacturing-based services, production planning and control, and supply chain management. Flexibility should be understood in its widest sense as a system’s ability to respond to changes in the environment through improved decision making and business development procedures and enabling IT solutions.
期刊最新文献
Integrated planning approach for fleet sizing and fleet management of freight railcars Reimbursement policy considering patient revisits from online to offline in a public healthcare system ADP- and rollout-based dynamic vehicle routing for pick-up service via budgeting capacity Outsourcing and authorized remanufacturing under voluntary emission reduction mechanism Berth and yard scheduling optimization for a port with diagonal yard layout
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1