A Lagrangian heuristic for integrated production planning, material ordering and investment multi-project scheduling in a project-driven supply chain

IF 2.2 3区 工程技术 Q2 ENGINEERING, MULTIDISCIPLINARY Engineering Optimization Pub Date : 2023-11-10 DOI:10.1080/0305215x.2023.2276430
Ali Panchami Afra, Amirsaman Kheirkhah
{"title":"A Lagrangian heuristic for integrated production planning, material ordering and investment multi-project scheduling in a project-driven supply chain","authors":"Ali Panchami Afra, Amirsaman Kheirkhah","doi":"10.1080/0305215x.2023.2276430","DOIUrl":null,"url":null,"abstract":"AbstractEffective decision making in large project planning presents a significant challenge. Despite progress in developing mathematical models, few studies comprehensively address project and supply-chain management aspects in an integrated framework. This article presents an integrated approach for multi-project resource investment, material ordering and production planning in a project-driven supply chain. A mixed-integer programming model is developed to optimize the total cost of renewable resource investment, production, transportation, and material ordering and holding, with an opportunity to share mobile renewable resources across multiple projects. A Lagrangian relaxation heuristic algorithm is proposed to determine the upper and lower bounds for the objective function, with an additional set of valid cuts to reduce the distance between bounds. The results of numerical experiments demonstrate the favourable performance of the proposed algorithm compared to the GAMS solver. This article provides insights into supply-chain participant expenses and activity scheduling based on these findings.KEYWORDS: Project-driven supply chainmulti-project resource investmentmaterial orderingproduction planningLagrangian relaxation Disclosure statementNo potential conflict of interest was reported by the authors.Data availability statementThe authors confirm that the data supporting the findings of this study are available within the article.","PeriodicalId":50521,"journal":{"name":"Engineering Optimization","volume":"121 8","pages":"0"},"PeriodicalIF":2.2000,"publicationDate":"2023-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Optimization","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/0305215x.2023.2276430","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

AbstractEffective decision making in large project planning presents a significant challenge. Despite progress in developing mathematical models, few studies comprehensively address project and supply-chain management aspects in an integrated framework. This article presents an integrated approach for multi-project resource investment, material ordering and production planning in a project-driven supply chain. A mixed-integer programming model is developed to optimize the total cost of renewable resource investment, production, transportation, and material ordering and holding, with an opportunity to share mobile renewable resources across multiple projects. A Lagrangian relaxation heuristic algorithm is proposed to determine the upper and lower bounds for the objective function, with an additional set of valid cuts to reduce the distance between bounds. The results of numerical experiments demonstrate the favourable performance of the proposed algorithm compared to the GAMS solver. This article provides insights into supply-chain participant expenses and activity scheduling based on these findings.KEYWORDS: Project-driven supply chainmulti-project resource investmentmaterial orderingproduction planningLagrangian relaxation Disclosure statementNo potential conflict of interest was reported by the authors.Data availability statementThe authors confirm that the data supporting the findings of this study are available within the article.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
项目驱动供应链中集成生产计划、物料订购和投资多项目调度的拉格朗日启发式
大型项目规划中的有效决策提出了一个重大挑战。尽管在发展数学模型方面取得了进展,但很少有研究在一个综合框架中全面解决项目和供应链管理方面的问题。本文提出了一种在项目驱动的供应链中进行多项目资源投资、材料订购和生产计划的集成方法。为了优化可再生资源投资、生产、运输、材料订购和持有的总成本,并使可再生资源在多个项目间共享,建立了混合整数规划模型。提出了一种拉格朗日松弛启发式算法来确定目标函数的上界和下界,并增加了一组有效的切割来减小边界之间的距离。数值实验结果表明,与GAMS求解器相比,该算法具有良好的性能。本文提供了基于这些发现的供应链参与者费用和活动安排的见解。关键词:项目驱动供应链,多项目资源投资,材料订购,生产计划,拉格朗日松弛披露声明,作者未发现潜在的利益冲突。数据可用性声明作者确认在文章中可以获得支持本研究结果的数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Engineering Optimization
Engineering Optimization 管理科学-工程:综合
CiteScore
5.90
自引率
7.40%
发文量
74
审稿时长
3.5 months
期刊介绍: Engineering Optimization is an interdisciplinary engineering journal which serves the large technical community concerned with quantitative computational methods of optimization, and their application to engineering planning, design, manufacture and operational processes. The policy of the journal treats optimization as any formalized numerical process for improvement. Algorithms for numerical optimization are therefore mainstream for the journal, but equally welcome are papers which use the methods of operations research, decision support, statistical decision theory, systems theory, logical inference, knowledge-based systems, artificial intelligence, information theory and processing, and all methods which can be used in the quantitative modelling of the decision-making process. Innovation in optimization is an essential attribute of all papers but engineering applicability is equally vital. Engineering Optimization aims to cover all disciplines within the engineering community though its main focus is in the areas of environmental, civil, mechanical, aerospace and manufacturing engineering. Papers on both research aspects and practical industrial implementations are welcomed.
期刊最新文献
Hybrid machine learning and optimization method for solar irradiance forecasting An improved whale optimization algorithm for multi-robot path planning A pointwise weighting prediction variance–high-dimensional model representation model-based global optimization approach for ship hull parametric design Optimization of reliable vehicle routing problem for medical waste collection with time windows in stochastic transportation networks Contrastive loss with dynamic margin for rubber-recipe physical-property prediction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1