K. Velmurugan, S. Saravanasankar, P. Venkumar, K.P. Paranitharan, R. Sudhakarapandian
{"title":"Industry 4.0: smart preventive maintenance with optimal planning and scheduling process of the SMEs","authors":"K. Velmurugan, S. Saravanasankar, P. Venkumar, K.P. Paranitharan, R. Sudhakarapandian","doi":"10.1504/ijvcm.2023.129267","DOIUrl":null,"url":null,"abstract":"In the modern world, small and medium scale manufacturing industries face a lot of challenges to achieve the reliability, availability, and safety as important performance attributes of the shop floor. In which planning and scheduling of preventive maintenance activities are considered to be a major issue in SMEs. This study is to propose the optimal framework of the preventive maintenance (PM) planning and scheduling process in SMEs. The optimal maintenance parameters (failure rate and repair rate), availability variations of the systems have been predicted through the utilisation of the Markov birth-death approach. To overcome the drawbacks associated with the existing optimal PM plan, a new approach is proposed in this study to develop an optimal preventive maintenance plan for electronic actuating switch manufacturers through the digital ecosystem. This proposed method integrates manufacturing subsystem failure into smart digital ecosystems and also to estimate the actual remaining useful life of the machines.","PeriodicalId":43149,"journal":{"name":"International Journal of Value Chain Management","volume":null,"pages":null},"PeriodicalIF":0.5000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Value Chain Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijvcm.2023.129267","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1
Abstract
In the modern world, small and medium scale manufacturing industries face a lot of challenges to achieve the reliability, availability, and safety as important performance attributes of the shop floor. In which planning and scheduling of preventive maintenance activities are considered to be a major issue in SMEs. This study is to propose the optimal framework of the preventive maintenance (PM) planning and scheduling process in SMEs. The optimal maintenance parameters (failure rate and repair rate), availability variations of the systems have been predicted through the utilisation of the Markov birth-death approach. To overcome the drawbacks associated with the existing optimal PM plan, a new approach is proposed in this study to develop an optimal preventive maintenance plan for electronic actuating switch manufacturers through the digital ecosystem. This proposed method integrates manufacturing subsystem failure into smart digital ecosystems and also to estimate the actual remaining useful life of the machines.
期刊介绍:
Today"s businesses have become extremely complex. The interplay of the three Cs, viz. consumers, competition and convergence, has thrown up new challenges for organisations all over the world. Sensitivity of economies to the external environment coupled with the turbulent process of globalisation has added the highest degree of uncertainty and unpredictability to business processes. To top it all, the effect of globalisation has shifted the balance of power in favour of the customer, though it may have opened a plethora of opportunities for all, in the form of variety and choice. For a variety of reasons, the pressures of competitive forces have enhanced product changes, supercharged by shortening product and technology development lifecycles.