Application of an Engineer of Record (EoR) for safety benefits in water storage dams

Pub Date : 2023-01-01 DOI:10.1590/2318-0331.282320230022
André Carlos Silva, Igor Gonzaga Martins Santos, Adriano Silva Bastos, Adinele Gomes Guimarães, Carlos Barreira Martinez
{"title":"Application of an Engineer of Record (EoR) for safety benefits in water storage dams","authors":"André Carlos Silva, Igor Gonzaga Martins Santos, Adriano Silva Bastos, Adinele Gomes Guimarães, Carlos Barreira Martinez","doi":"10.1590/2318-0331.282320230022","DOIUrl":null,"url":null,"abstract":"ABSTRACT The dam safety depends heavily on the organizational structure, the developer’s philosophy, and the involved actor’s technical responsibility. In this context, the present research aimed to: introduce the concept of Engineer of Record (EoR); discuss their influence on the continuous improvement of dam safety, propose a work plan for this professional applicable to water storage dams, and estimate the costs associated with their team. Since mining dams have experienced recent accidents, safety laws, and methodologies are more stringent for these structures. Therefore, based on this experience, a list of actions for the EoR was proposed, targeted explicitly at water storage dams, divided into two stages: the first to comply with the National Dam Safety Policy (NDSP); and the second focused on the continuous improvement of the safety of these structures. Additionally, a cost estimate was conducted, resulting in a value of $ 0.15 per m3 consumed for implementing an EoR team.","PeriodicalId":0,"journal":{"name":"","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/2318-0331.282320230022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT The dam safety depends heavily on the organizational structure, the developer’s philosophy, and the involved actor’s technical responsibility. In this context, the present research aimed to: introduce the concept of Engineer of Record (EoR); discuss their influence on the continuous improvement of dam safety, propose a work plan for this professional applicable to water storage dams, and estimate the costs associated with their team. Since mining dams have experienced recent accidents, safety laws, and methodologies are more stringent for these structures. Therefore, based on this experience, a list of actions for the EoR was proposed, targeted explicitly at water storage dams, divided into two stages: the first to comply with the National Dam Safety Policy (NDSP); and the second focused on the continuous improvement of the safety of these structures. Additionally, a cost estimate was conducted, resulting in a value of $ 0.15 per m3 consumed for implementing an EoR team.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
记录工程师(EoR)在蓄水大坝安全效益中的应用
大坝安全在很大程度上取决于组织结构、开发商的理念和相关人员的技术责任。在此背景下,本研究旨在:引入记录工程师(EoR)的概念;讨论他们对大坝安全持续改进的影响,提出该专业适用于蓄水大坝的工作计划,并估算与他们团队相关的成本。由于矿坝最近发生了事故,安全法规和方法对这些结构更加严格。因此,根据这一经验,提出了一份提高采收率的行动清单,明确针对蓄水大坝,分为两个阶段:第一阶段遵守国家大坝安全政策(NDSP);第二个重点是持续改进这些结构的安全性。此外,还进行了成本估算,结果显示,实施一个提高采收率小组的成本为每立方米0.15美元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1