Conductor Arrangement and Phase Sequence Optimization Scheme for 500 kV Four-Circuit Transmission Lines on Same Tower

Deng Lu, Xujun Lang, Bo Yang, Ziyang Li, Hang Geng
{"title":"Conductor Arrangement and Phase Sequence Optimization Scheme for 500 kV Four-Circuit Transmission Lines on Same Tower","authors":"Deng Lu, Xujun Lang, Bo Yang, Ziyang Li, Hang Geng","doi":"10.32604/ee.2023.029140","DOIUrl":null,"url":null,"abstract":"The four-circuit parallel line on the same tower effectively solves the problems faced by the line reconstruction and construction under the condition of the increasing shortage of transmission corridors. Optimizing the conductor and phase sequence arrangement of multiple transmission lines is conducive to improving electromagnetic and electrostatic coupling caused by electromagnetic problems. This paper uses the ATP-EMTP simulation software to build a 500 kV multi-circuit transmission line on the same tower. It stimulates the induced voltage and current values of different line lengths, tower spacing, vertical and horizontal spacing between different circuits, phase sequence arrangement, and nominal tower height. Moreover, use the BP neural network optimized by a genetic algorithm to predict the induced voltage and current under the unknown conductor and phase sequence arrangement. Finally, based on multi-objective particle swarm algorithm to construct the optimization model of conductor arrangement scheme of overhead transmission line, combined with electromagnetic environment control index, determine the optimal conductor arrangement scheme by the size of particle fitness function, a significant reduction in induced voltages and currents between transmission lines and the four-circuit conductor layout scheme meeting the requirements of the electromagnetic environment is obtained, which provides a reference for the tower design of the transmission station project.","PeriodicalId":35610,"journal":{"name":"Energy Engineering: Journal of the Association of Energy Engineers","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Engineering: Journal of the Association of Energy Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32604/ee.2023.029140","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

The four-circuit parallel line on the same tower effectively solves the problems faced by the line reconstruction and construction under the condition of the increasing shortage of transmission corridors. Optimizing the conductor and phase sequence arrangement of multiple transmission lines is conducive to improving electromagnetic and electrostatic coupling caused by electromagnetic problems. This paper uses the ATP-EMTP simulation software to build a 500 kV multi-circuit transmission line on the same tower. It stimulates the induced voltage and current values of different line lengths, tower spacing, vertical and horizontal spacing between different circuits, phase sequence arrangement, and nominal tower height. Moreover, use the BP neural network optimized by a genetic algorithm to predict the induced voltage and current under the unknown conductor and phase sequence arrangement. Finally, based on multi-objective particle swarm algorithm to construct the optimization model of conductor arrangement scheme of overhead transmission line, combined with electromagnetic environment control index, determine the optimal conductor arrangement scheme by the size of particle fitness function, a significant reduction in induced voltages and currents between transmission lines and the four-circuit conductor layout scheme meeting the requirements of the electromagnetic environment is obtained, which provides a reference for the tower design of the transmission station project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
500kv同塔四回路输电线路导线布置及相序优化方案
同塔四回路平行线有效地解决了输电走廊日益紧缺的情况下线路改造建设面临的问题。优化多条传输线的导线和相序排列有利于改善由电磁问题引起的电磁和静电耦合问题。本文利用ATP-EMTP仿真软件在同一塔上搭建了一条500kv多回路输电线路。它刺激不同线路长度、塔间距、不同电路之间的垂直和水平间距、相序排列和标称塔高的感应电压和电流值。利用遗传算法优化的BP神经网络对未知导体和相序排列情况下的感应电压和感应电流进行了预测。最后,基于多目标粒子群算法构建架空输电线路导线布置方案优化模型,结合电磁环境控制指标,通过粒子适应度函数的大小确定最优导线布置方案;得到了显著降低输电线路间感应电压和感应电流,满足电磁环境要求的四回路导线布置方案,为输电站工程铁塔设计提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
0.90
自引率
0.00%
发文量
122
期刊介绍: Energy Engineering is a bi-monthly publication of the Association of Energy Engineers, Atlanta, GA. The journal invites original manuscripts involving engineering or analytical approaches to energy management.
期刊最新文献
Evaluation of Process and Economic Feasibility of Implementing a Topping Cycle Cogeneration Determination of Effectiveness of Energy Management System in Buildings Research on Representative Engineering Applications of Anemometer Towers Location in Complex Topography Wind Resource Assessment Investigation on the Long Term Operational Stability of Underground Energy Storage in Salt Rock Research on the MPPT of Photovoltaic Power Generation Based on the CSA-INC Algorithm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1