Deferment Roots in Building Formation and Construction Projects in South-eastern Nigeria

IF 0.6 Q3 ENGINEERING, MULTIDISCIPLINARY Mehran University Research Journal of Engineering and Technology Pub Date : 2023-09-24 DOI:10.36630/jpses_23014
Richard E Madukwe, Henry C Umunakwe
{"title":"Deferment Roots in Building Formation and Construction Projects in South-eastern Nigeria","authors":"Richard E Madukwe, Henry C Umunakwe","doi":"10.36630/jpses_23014","DOIUrl":null,"url":null,"abstract":"Deferment in the course of building formation and construction projects is an aspect of the shared situations in the formation stage of the building industry, several factors like timing, availability of raw material, delay in down payment, and readiness of finance, construction goodwill and building logistics. This study is aimed at determining the prime roots of deferments in the formation stage of building projects in South-eastern Nigeria. Research study approach was engaged throughout the sampled urban areas in South-eastern Nigeria, for instance: Aba, Abakalikki, Owerri, and Awka. 150 copies of well-completed questionnaires were collected and analyzed. The outcome specified that disparities roots, deferments in stage-to-stage overheads, bidding below cost price, and subcontractors’ weak execution, and complications in communication were fundamental to the deferments in the execution of building projects in South-eastern Nigeria. This study is the foremost on the roots of deferments in the formation stage of building projects in South-eastern Nigeria. The relative study revealed two exceptional roots of deferments in the Nigerian building industry, for instance, pressure in demanding job safety, and irrational demand for advance disbursements by constructors. It also discloses diverse categories of deferment roots in accordance by means of notable civil and financial situations in South-eastern Nigeria. Conclusively, the result from the study is not only applicable to South-eastern Nigeria but can be extended to building construction projects in other parts of the developing nations of the world for similar outcomes. Keywords: Deferments; building projects; hazard supervision; South-eastern Nigeria, building formation; relative study; building construction.","PeriodicalId":44836,"journal":{"name":"Mehran University Research Journal of Engineering and Technology","volume":"30 1","pages":"0"},"PeriodicalIF":0.6000,"publicationDate":"2023-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mehran University Research Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36630/jpses_23014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

Deferment in the course of building formation and construction projects is an aspect of the shared situations in the formation stage of the building industry, several factors like timing, availability of raw material, delay in down payment, and readiness of finance, construction goodwill and building logistics. This study is aimed at determining the prime roots of deferments in the formation stage of building projects in South-eastern Nigeria. Research study approach was engaged throughout the sampled urban areas in South-eastern Nigeria, for instance: Aba, Abakalikki, Owerri, and Awka. 150 copies of well-completed questionnaires were collected and analyzed. The outcome specified that disparities roots, deferments in stage-to-stage overheads, bidding below cost price, and subcontractors’ weak execution, and complications in communication were fundamental to the deferments in the execution of building projects in South-eastern Nigeria. This study is the foremost on the roots of deferments in the formation stage of building projects in South-eastern Nigeria. The relative study revealed two exceptional roots of deferments in the Nigerian building industry, for instance, pressure in demanding job safety, and irrational demand for advance disbursements by constructors. It also discloses diverse categories of deferment roots in accordance by means of notable civil and financial situations in South-eastern Nigeria. Conclusively, the result from the study is not only applicable to South-eastern Nigeria but can be extended to building construction projects in other parts of the developing nations of the world for similar outcomes. Keywords: Deferments; building projects; hazard supervision; South-eastern Nigeria, building formation; relative study; building construction.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
尼日利亚东南部建筑成型和建设项目的延期根源
建筑形成和建设项目过程中的延迟是建筑行业形成阶段共有情况的一个方面,包括时间、原材料的可用性、首付的延迟、融资的准备、建筑商誉和建筑物流等因素。本研究旨在确定尼日利亚东南部建设项目形成阶段延迟的主要根源。在尼日利亚东南部的抽样城市地区,例如:Aba、Abakalikki、Owerri和Awka,采用了调查研究方法,收集和分析了150份完整的调查问卷。结果表明,差距的根源、阶段对阶段管理费用的延迟、低于成本价的投标、分包商的执行不力以及沟通的复杂性是尼日利亚东南部建筑项目执行延迟的根本原因。本研究是对尼日利亚东南部建设项目形成阶段延期根源的初步研究。相关研究揭示了尼日利亚建筑业延期的两个特殊根源,例如,要求工作安全的压力,以及建筑商对预付款的不合理要求。它还根据尼日利亚东南部显著的民事和财政状况披露了不同类别的延期根源。最后,该研究的结果不仅适用于尼日利亚东南部,而且可以推广到世界其他发展中国家的建筑项目中,以获得类似的结果。关键词:缓服兵役的时间;建设项目;风险监督;尼日利亚东南部,建筑形成;相对研究;建筑施工。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
76
审稿时长
40 weeks
期刊最新文献
Heat transfer augmentation through engine oil-based hybrid nanofluid inside a trapezoid cavity Sustainable natural dyeing of cellulose with agricultural medicinal plant waste, new shades development with nontoxic sustainable elements Fabrication of low-cost and environmental-friendly EHD printable thin film nanocomposite triboelectric nanogenerator using household recyclable materials Compositional analysis of dark colored particulates homogeneously emitted with combustion gases (dark plumes) from brick making kilns situated in the area of Khyber Pakhtunkhwa, Pakistan Biosorption studies on arsenic (III) removal from industrial wastewater by using fixed and fluidized bed operation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1