10World Bank Inspection Panel: The Inspection Panel Report and Recommendation on a Request for Inspection: Republic of Cameroon Nachtigal Hydropower Project (P157734) and Hydropower Development on the Sanaga River Technical Assistance Project (P157733), Report No. Report No. 176365-cm, 27 September 2022
{"title":"10World Bank Inspection Panel: The Inspection Panel Report and Recommendation on a Request for Inspection: Republic of Cameroon Nachtigal Hydropower Project (P157734) and Hydropower Development on the Sanaga River Technical Assistance Project (P157733), Report No. Report No. 176365-cm, 27 September 2022","authors":"","doi":"10.1163/24056901-09010020","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":486998,"journal":{"name":"International labor rights case law","volume":"66 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International labor rights case law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1163/24056901-09010020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}