{"title":"Analisis Aliran Daya Pembangkit Hybrid (Photovoltaic/Diesel) Pada Menara Mercusuar Di Pulau Pandang","authors":"","doi":"10.30596/rmme.v6i2.14224","DOIUrl":null,"url":null,"abstract":"Study of power flow analysis to obtain information about the flow of power or voltage in an electric power system. As time goes by and the number of tourists on Pandang Island, especially in the development and change sector, will also increase, the amount of burden incurred will also increase, so that a good initial design is no longer suitable for the current load. For this reason, it is necessary to analyze the power flow in order to determine the condition of the electric power system. The benefits of this research are also for planning evaluation if there will be additional burden innovations. In this study, ETAP Power Station 19.0 software was used using Newton Raphson for power flow simulation. The results obtained in the Etap simulation are 37% generating load with a total active power of 10.35 KW, reactive power of 6.85 Kvar, and apparent power of 12.42 KVA. This research also increases the load by 4,800 watts, where the photovoltaic generator must increase the photovoltaic capacity from the previous 10.26 kw to 13.29 kw, therefore solar cell panels will be added as many as 8 panels.","PeriodicalId":53345,"journal":{"name":"Jurnal Energi Dan Manufaktur","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Energi Dan Manufaktur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30596/rmme.v6i2.14224","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Study of power flow analysis to obtain information about the flow of power or voltage in an electric power system. As time goes by and the number of tourists on Pandang Island, especially in the development and change sector, will also increase, the amount of burden incurred will also increase, so that a good initial design is no longer suitable for the current load. For this reason, it is necessary to analyze the power flow in order to determine the condition of the electric power system. The benefits of this research are also for planning evaluation if there will be additional burden innovations. In this study, ETAP Power Station 19.0 software was used using Newton Raphson for power flow simulation. The results obtained in the Etap simulation are 37% generating load with a total active power of 10.35 KW, reactive power of 6.85 Kvar, and apparent power of 12.42 KVA. This research also increases the load by 4,800 watts, where the photovoltaic generator must increase the photovoltaic capacity from the previous 10.26 kw to 13.29 kw, therefore solar cell panels will be added as many as 8 panels.
研究潮流分析,以获得电力系统中功率或电压的流动信息。随着时间的推移和在盘东岛的游客数量,特别是在开发和变化部门,也会增加,所产生的负担量也会增加,以至于一个好的初始设计不再适合目前的负荷。为此,有必要对潮流进行分析,以确定电力系统的状态。这项研究的好处也可用于规划评价,如果会有额外的负担创新。本研究使用ETAP Power Station 19.0软件,采用Newton Raphson进行潮流模拟。Etap仿真的结果为:发电负荷为37%,总有功功率为10.35 KW,无功功率为6.85 Kvar,视在功率为12.42 KVA。本研究还增加了4800瓦的负荷,其中光伏发电机必须将光伏容量从之前的10.26千瓦增加到13.29千瓦,因此太阳能电池板将增加多达8块。