Analisis Penyebab dan Solusi Masalah Durasi Overhaul Dump Truck Komatsu HD 785-7 Tidak Sesuai Rencana

{"title":"Analisis Penyebab dan Solusi Masalah Durasi Overhaul Dump Truck Komatsu HD 785-7 Tidak Sesuai Rencana","authors":"","doi":"10.30596/rmme.v6i2.15916","DOIUrl":null,"url":null,"abstract":"Dump Truck is one of the heavy equipment that functions to transport materials such as soil and coal. For this machine to always be in the best condition, periodic maintenance is required, one of which is overhaul maintenance. There are various types of overhaul work on the Komatsu HD 785-7 dump truck unit. Even though there was good planning before the work started, there were still problems with the duration of the Komatsu HD 785-7 overhaul dump truck work which was not in accordance with the initial plan and resulted in the company as a heavy equipment rental service provider losing money. The purpose of this study is to analyze the causes of the duration of work on the Komatsu HD 785-7 dump truck overhaul and provide a solution as a recommendation or reference for the company. The method used is descriptive quantitative method. Descriptive quantitative methods are used to understand an event regarding the duration of an overhaul that is not according to plan in depth, by describing and explaining the characteristics of the incident. Collecting data by interviewing workers, observing in the field, distributing questionnaires and archives of previous overhaul work documents. The results of the study show that the main cause of the duration of work that is not according to plan is the arrival of spare parts or major components not according to schedule, and the addition of work accompanied by the addition of spare parts. The solution provided is to schedule joint inspection work to be carried out earlier with the aim of being able to find out the additional spare parts needed so that the ordering time can be made earlier and the waiting time for spare parts supply can be reduced.","PeriodicalId":53345,"journal":{"name":"Jurnal Energi Dan Manufaktur","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Energi Dan Manufaktur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30596/rmme.v6i2.15916","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Dump Truck is one of the heavy equipment that functions to transport materials such as soil and coal. For this machine to always be in the best condition, periodic maintenance is required, one of which is overhaul maintenance. There are various types of overhaul work on the Komatsu HD 785-7 dump truck unit. Even though there was good planning before the work started, there were still problems with the duration of the Komatsu HD 785-7 overhaul dump truck work which was not in accordance with the initial plan and resulted in the company as a heavy equipment rental service provider losing money. The purpose of this study is to analyze the causes of the duration of work on the Komatsu HD 785-7 dump truck overhaul and provide a solution as a recommendation or reference for the company. The method used is descriptive quantitative method. Descriptive quantitative methods are used to understand an event regarding the duration of an overhaul that is not according to plan in depth, by describing and explaining the characteristics of the incident. Collecting data by interviewing workers, observing in the field, distributing questionnaires and archives of previous overhaul work documents. The results of the study show that the main cause of the duration of work that is not according to plan is the arrival of spare parts or major components not according to schedule, and the addition of work accompanied by the addition of spare parts. The solution provided is to schedule joint inspection work to be carried out earlier with the aim of being able to find out the additional spare parts needed so that the ordering time can be made earlier and the waiting time for spare parts supply can be reduced.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分析原因和解决方案问题持续时间轴纵向HD 787 -7未按计划进行
自卸车是运输土、煤等物料的重型设备之一。为了使这台机器始终处于最佳状态,需要定期维护,其中之一就是大修维护。在小松HD 785-7自卸卡车单元上有各种类型的大修工作。尽管在工作开始前有很好的计划,但小松HD 785-7大修自卸车工作的持续时间仍然存在问题,这与最初的计划不一致,导致公司作为重型设备租赁服务提供商亏损。本研究的目的是分析小松HD 785-7自卸车大修工期的原因,并提供解决方案,为公司提供建议或参考。采用描述性定量方法。描述性定量方法是通过描述和解释事件的特征,来了解与大修持续时间有关的事件,而大修没有深入地按照计划进行。通过对工人进行访谈、实地观察、发放调查问卷和以往检修工作文件档案等方式收集资料。研究结果表明,造成工期不按计划进行的主要原因是备件或主要部件未按计划到达,以及在增加工作的同时增加了备件。提供的解决方案是将联合检查工作安排得更早,目的是能够找到所需的额外备件,从而可以提前订购时间,减少备件供应的等待时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
13
审稿时长
24 weeks
期刊最新文献
Penggunaan Las Gesek (Friction Welding) Guna Penyambungan Dua Buah Logam Baja Karbon ST 42 pada Pengujian Tarik dan Struktur Mikro untuk Spring Pin pada Mobil STUDI EKSPERIMENTAL NATURAL REFIGERANT DENGAN VARIASI DIAMETER TiT-HEAT EXCHANGER TERHADAP REFRIGERATOR PERFORMANCE Sintesis kapsul mikro poli (urea-formaldehid) berisi minyak biji rami sebagai self-healing coating dengan variasi kecepatan agitasi Analisis Pengaruh Waktu Etsa Terhadap Ukuran Struktur Mikrografi Material Logam dan Paduannya Analisis Audit Energi di Gedung Teknik Elektro Universitas Diponegoro
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1