{"title":"Tucson adds First Solar modules at Springerville","authors":"","doi":"10.1016/S1473-8325(03)01004-6","DOIUrl":null,"url":null,"abstract":"<div><p>In Arizona, First Solar has supplied two PV arrays totalling 240 kWp for Tucson Electric Power (TEP) at the company’s Springerville Generating Station.</p><p>This is a short news story only. Visit <span>www.re-focus.net</span><svg><path></path></svg> for the latest renewable energy industry news.</p></div>","PeriodicalId":101022,"journal":{"name":"Photovoltaics Bulletin","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2003-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1473-8325(03)01004-6","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Photovoltaics Bulletin","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1473832503010046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In Arizona, First Solar has supplied two PV arrays totalling 240 kWp for Tucson Electric Power (TEP) at the company’s Springerville Generating Station.
This is a short news story only. Visit www.re-focus.net for the latest renewable energy industry news.