Lessons Learned Framework for Efficient Delivery of Construction Projects in Saudi Arabia

IF 1.8 Q3 MANAGEMENT Construction Economics and Building Pub Date : 2021-12-06 DOI:10.5130/ajceb.v21i4.7858
Abdullatif A. AlMunifi,Saud Almutairi
{"title":"Lessons Learned Framework for Efficient Delivery of Construction Projects in Saudi Arabia","authors":"Abdullatif A. AlMunifi,Saud Almutairi","doi":"10.5130/ajceb.v21i4.7858","DOIUrl":null,"url":null,"abstract":"The Kingdom of Saudi Arabia (KSA) has the largest construction market in the gulf region. Nevertheless, the sector faces issues related to inefficiency and ineffectiveness in project delivery. This research aims to explore the impact of current practices across projects lifecycles, and to utilize findings to develop an integrated strategic construction project management framework (ISCPMF) that may pave the way to efficient and effective project implementation. To achieve this objective, the authors have traced the implementation processes of nine projects for data collection. This was based on a deductive approach with preconceived themes. Within-case and cross-case analysis was conducted. The data was complemented by holding three separate focus-group discussions with a total of nineteen participants, and the initial findings were cross-checked with six experts. The deficiencies that surround the pre-construction phase and disconnected activities that are carried out in different timespans represent the first barrier to implement projects successfully. This is coupled with low capacities contractors and non-proactive construction teams that lack a management toolbox to alleviate accumulated issues and control project progress. The unavailability of infrastructure and utilities did not ease construction nor made inspection possible, which led to late occupancy of facilities, waste of resources and failure to deliver the desired benefits effectively. The adoption of ISCPMF will institutionalize and bridge project phases. This may play a vital role in implementing projects efficiently and effectively and building data to benefit future projects. Though the research is limited to higher education facilities, the findings may be generalized to public construction projects.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2021-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/ajceb.v21i4.7858","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

The Kingdom of Saudi Arabia (KSA) has the largest construction market in the gulf region. Nevertheless, the sector faces issues related to inefficiency and ineffectiveness in project delivery. This research aims to explore the impact of current practices across projects lifecycles, and to utilize findings to develop an integrated strategic construction project management framework (ISCPMF) that may pave the way to efficient and effective project implementation. To achieve this objective, the authors have traced the implementation processes of nine projects for data collection. This was based on a deductive approach with preconceived themes. Within-case and cross-case analysis was conducted. The data was complemented by holding three separate focus-group discussions with a total of nineteen participants, and the initial findings were cross-checked with six experts. The deficiencies that surround the pre-construction phase and disconnected activities that are carried out in different timespans represent the first barrier to implement projects successfully. This is coupled with low capacities contractors and non-proactive construction teams that lack a management toolbox to alleviate accumulated issues and control project progress. The unavailability of infrastructure and utilities did not ease construction nor made inspection possible, which led to late occupancy of facilities, waste of resources and failure to deliver the desired benefits effectively. The adoption of ISCPMF will institutionalize and bridge project phases. This may play a vital role in implementing projects efficiently and effectively and building data to benefit future projects. Though the research is limited to higher education facilities, the findings may be generalized to public construction projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
沙特阿拉伯建设项目高效交付的经验教训框架
沙特阿拉伯王国(KSA)拥有海湾地区最大的建筑市场。然而,该部门面临着与项目执行效率低下和无效有关的问题。本研究旨在探索当前实践对项目生命周期的影响,并利用研究结果开发一个综合战略建设项目管理框架(ISCPMF),为高效和有效的项目实施铺平道路。为了实现这一目标,作者追踪了9个数据收集项目的执行过程。这是基于预设主题的演绎方法。进行了案例内和跨案例分析。对这些数据进行了补充,共与19名参与者进行了三次单独的焦点小组讨论,并与六名专家进行了初步调查。围绕施工前阶段的缺陷和在不同时间范围内进行的不连贯的活动是成功实施项目的第一个障碍。这与能力低下的承包商和缺乏主动性的施工团队相结合,他们缺乏管理工具箱来缓解累积的问题并控制项目进度。由于没有基础设施和公用事业,既不能方便施工,也不能进行检查,从而导致设施占用时间过晚、资源浪费和未能有效地提供预期的利益。方案管理基金的通过将使项目各阶段制度化和衔接起来。这可能在高效和有效地实施项目以及为未来项目建立数据方面发挥至关重要的作用。虽然研究仅限于高等教育设施,但研究结果可以推广到公共建设项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.80
自引率
6.20%
发文量
0
审稿时长
20 weeks
期刊介绍: Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.
期刊最新文献
The Institutional Field Of Learning From Project-Related Failures – Opportunities and Challenges. Framework for Evaluating the Success of Integrated Project Delivery in the Industrial Construction Sector: A Mixed Methods Approach & Machine Learning Application Success Factors of the Consultant Selection Stage of the Ghanaian Public Construction Projects: The Road Sector’s Perspective Roofing Distributor Employee Perception: Workforce Attraction/Retention and Need Adopting qualitative data in conceptual system dynamic modelling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1