Reconstruction of the Bridge Over the Hron River in Village Hronovce

IF 1.1 Q3 ENGINEERING, CIVIL Civil and Environmental Engineering Pub Date : 2023-12-01 DOI:10.2478/cee-2023-0066
Jozef Vičan, J. Gocál, J. Odrobiňák
{"title":"Reconstruction of the Bridge Over the Hron River in Village Hronovce","authors":"Jozef Vičan, J. Gocál, J. Odrobiňák","doi":"10.2478/cee-2023-0066","DOIUrl":null,"url":null,"abstract":"Abstract The paper deals with the reconstruction of four-span bridge carrying the third-class road over the Hron river nearby village Hronovce. The need of immediate reconstruction of the bridge object was evocated by an accident of the middle pier. The reconstruction consisted of two phases: the sanitation of the substructure and the replacement of the original superstructure, which was in bad technical condition. This paper deals mainly with the second stage, e.g., the design of new superstructure, which was suggested as a continuous, three-span steel and concrete composite structure.","PeriodicalId":42034,"journal":{"name":"Civil and Environmental Engineering","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and Environmental Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/cee-2023-0066","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract The paper deals with the reconstruction of four-span bridge carrying the third-class road over the Hron river nearby village Hronovce. The need of immediate reconstruction of the bridge object was evocated by an accident of the middle pier. The reconstruction consisted of two phases: the sanitation of the substructure and the replacement of the original superstructure, which was in bad technical condition. This paper deals mainly with the second stage, e.g., the design of new superstructure, which was suggested as a continuous, three-span steel and concrete composite structure.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
重建赫罗诺夫采村赫龙河大桥
摘要 本文论述了赫罗诺夫采村附近赫龙河上三级公路四跨桥梁的重建问题。由于中间桥墩发生事故,需要立即重建桥梁。重建包括两个阶段:清理下部结构和更换技术状况不佳的原有上部结构。本文主要讨论第二阶段,即新上部结构的设计,建议采用连续的三跨钢筋混凝土复合结构。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.00
自引率
58.30%
发文量
69
期刊最新文献
Tensile Force Distribution And Development Within Geogrid-Reinforced Retaining Wall Evaluation of Bituminous Moisture Damage of High Silica Aggregate Research on the Long-Term Acoustic Efficiency of Asphalt Mixtures Using CRM in Test Sections of Slovak Roads Using Tuff and Limestone Sand to Minimize Water Consumption of Pavement Construction in Arid Regions Role of Real Estate Management Firms Toward Sustainability in India
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1