The METHODS OF INSTALLATION OF CONCRETE BLOCK LINING IN THE RANGE OF IRRIGATION MODERNIZATION PROJECT IN JATITUJUH DISTRICT MAJALENGKA DISTRICT

Laendra Anggara Sutisna, Abdul Kholiq
{"title":"The METHODS OF INSTALLATION OF CONCRETE BLOCK LINING IN THE RANGE OF IRRIGATION MODERNIZATION PROJECT IN JATITUJUH DISTRICT MAJALENGKA DISTRICT","authors":"Laendra Anggara Sutisna, Abdul Kholiq","doi":"10.31949/stima.v7i0.976","DOIUrl":null,"url":null,"abstract":"The Range Irrigation Area is a national strategic project located in the lowlands of the lower reaches of the Cimanuk River in the Northeastern part of West Java Province. Modernization of Span Irrigation is carried out because the age of the irrigation system is decades old, causing the performance of water services to decrease. The use of materials for construction that are in the ground or the groundwater table is by using a Steel Sheet Pile (SSP) which is driven to form a cofferdam (kisdam), this aims to provide a dry work area, and so that the river channel continues to flow from upstream to downstream, while the objective of the Irrigation Modernization is the coating/installation of concrete block lining in river channels so as to reduce the water loss factor. Concrete block lining is a precast concrete specially designed for irrigation canals which functions as a retaining wall. There are 9 stages of work regarding the Concrete Block Lining Installation Implementation Method, starting from Preparation, Coffering, Dewatering, Cut And Fill, Subgrade, Concrete Block Lining, Caping Beam, Joint Sealent/Filler and Tool Shifting. Kata Kunci : Modernization of Irrigation, Steel Sheet Pile (SSP), Concrete Block Lining.","PeriodicalId":161203,"journal":{"name":"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)","volume":"199 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31949/stima.v7i0.976","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Range Irrigation Area is a national strategic project located in the lowlands of the lower reaches of the Cimanuk River in the Northeastern part of West Java Province. Modernization of Span Irrigation is carried out because the age of the irrigation system is decades old, causing the performance of water services to decrease. The use of materials for construction that are in the ground or the groundwater table is by using a Steel Sheet Pile (SSP) which is driven to form a cofferdam (kisdam), this aims to provide a dry work area, and so that the river channel continues to flow from upstream to downstream, while the objective of the Irrigation Modernization is the coating/installation of concrete block lining in river channels so as to reduce the water loss factor. Concrete block lining is a precast concrete specially designed for irrigation canals which functions as a retaining wall. There are 9 stages of work regarding the Concrete Block Lining Installation Implementation Method, starting from Preparation, Coffering, Dewatering, Cut And Fill, Subgrade, Concrete Block Lining, Caping Beam, Joint Sealent/Filler and Tool Shifting. Kata Kunci : Modernization of Irrigation, Steel Sheet Pile (SSP), Concrete Block Lining.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
贾蒂图朱赫县马贾伦卡区水利现代化项目范围内混凝土衬砌的安装方法
斯潘灌溉区(Range Irrigation Area)是一个国家战略项目,位于西爪哇省东北部奇马努克河(Cimanuk River)下游的低洼地带。对斯潘灌溉区进行现代化改造的原因是,灌溉系统已使用了几十年,导致供水服务性能下降。使用地下或地下水位的建筑材料是通过使用钢板桩(SSP)来形成围堰(kisdam),目的是提供一个干燥的工作区,使河道继续从上游流向下游,而灌溉现代化的目标是在河道中涂敷/安装混凝土块衬砌,以减少水的流失。混凝土砌块衬砌是一种专门为灌溉渠道设计的预制混凝土,具有挡土墙的功能。混凝土砌块衬砌安装实施方法共有 9 个工作阶段,分别是准备工作、封堵、排水、切割和填充、基层、混凝土砌块衬砌、盖梁、接缝密封/填充和工具转移。 Kata Kunci :灌溉现代化、钢板桩(SSP)、混凝土砌块衬砌。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PEMBUATAN PART RING RAINFORCEMENT MENGGUNAKAN MESIN PRESS STAMPING CHIN FONG 110 SISTEM INFORMASI PENGOLAHAN DATA ABSENSI PEGAWAI KANTOR BALAI KB KECAMATAN PANYINGKIRAN BERBASIS WEB DAN ANDROID Penentuan Waktu Baku dengan Metode Stopwacth Time Study Studi Kasus Depot Air Syam STUDI KELAYAKAN SIFAT – SIFAT AGREGAT UNTUK CAMPURAN BETON TERHADAP NILAI KUAT TEKAN BETON DI PROYEK REKONSTRUKSI ATAU PENINGKATAN KAPASITAS STRUKTUR JALAN KADUT – SP. GUNUNGLARANG TONGGOH KEC. BANTARUJEG KAB. MAJALENGKA Metode Pelaksanaan Pekerjaan Dinding Penahan Tanah (Retaining Wall) Pada Proyek Preservasi Jalan Cirebon - Palimanan - Sumedang (Studi Kasus : Longsoran Km.68+500 Kabupaten Sumedang)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1