{"title":"Barriers to risk management in small construction projects in Sri Lanka","authors":"Udara Willhelm Abeydera Lebunu Hewage, Jayantha Wadu Mesthrige, Eric G. Too","doi":"10.1108/bepam-06-2023-0104","DOIUrl":null,"url":null,"abstract":"PurposeThis study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.Design/methodology/approachThe current research study adopted a quantitative research method. Using a purposeful sampling strategy, 100 construction companies engaged in small construction projects in Sri Lanka were selected and a questionnaire was distributed among top managerial employees of these companies. Employees belonging to 47 companies responded to the survey which provided information relating to 812 construction projects. The collected data were analyzed using the RM implementation index (RMII) and other quantitative measures such as mean, median and percentages.FindingsThe research findings indicated that RM incorporation was at a lower degree in small construction projects in Sri Lanka. The findings further indicated that RM incorporation was relatively high in the public construction projects compared to the private construction projects. The main obstacles identified through the survey for RM implementation were: “lack of funding”, “lack of time”, “low profit margin”, “not economical” and “lack of knowledge”.Research limitations/implicationsThe study was limited to exploring RM implementation in small construction projects in Sri Lanka. The study was limited to the building construction companies under the 150-million-rupee (approx. below 450,000 USD) financial limit registered with the construction industry development authority in Sri Lanka.Originality/valueRM in small construction projects in developing countries is a relatively less explored domain. Sri Lankan construction industry is another relatively less explored domain in terms of new management technique implementation such as RM and value management. The quantitative approach used for the study revealed that RM implementation is at a lower degree in the small construction projects. Moreover, several obstacles pertaining to RM implementation were recognized through this study. These findings will be useful for the construction stakeholders to overcome the recognized barriers and effectively use RM in their respective construction projects.","PeriodicalId":505703,"journal":{"name":"Built Environment Project and Asset Management","volume":"95 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-06-2023-0104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PurposeThis study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.Design/methodology/approachThe current research study adopted a quantitative research method. Using a purposeful sampling strategy, 100 construction companies engaged in small construction projects in Sri Lanka were selected and a questionnaire was distributed among top managerial employees of these companies. Employees belonging to 47 companies responded to the survey which provided information relating to 812 construction projects. The collected data were analyzed using the RM implementation index (RMII) and other quantitative measures such as mean, median and percentages.FindingsThe research findings indicated that RM incorporation was at a lower degree in small construction projects in Sri Lanka. The findings further indicated that RM incorporation was relatively high in the public construction projects compared to the private construction projects. The main obstacles identified through the survey for RM implementation were: “lack of funding”, “lack of time”, “low profit margin”, “not economical” and “lack of knowledge”.Research limitations/implicationsThe study was limited to exploring RM implementation in small construction projects in Sri Lanka. The study was limited to the building construction companies under the 150-million-rupee (approx. below 450,000 USD) financial limit registered with the construction industry development authority in Sri Lanka.Originality/valueRM in small construction projects in developing countries is a relatively less explored domain. Sri Lankan construction industry is another relatively less explored domain in terms of new management technique implementation such as RM and value management. The quantitative approach used for the study revealed that RM implementation is at a lower degree in the small construction projects. Moreover, several obstacles pertaining to RM implementation were recognized through this study. These findings will be useful for the construction stakeholders to overcome the recognized barriers and effectively use RM in their respective construction projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
斯里兰卡小型建筑项目风险管理的障碍
本研究探讨了斯里兰卡风险管理(RM)的现状以及在斯里兰卡小型建筑项目中实施风险管理的障碍。采用有目的的抽样策略,选取了斯里兰卡从事小型建筑项目的 100 家建筑公司,并向这些公司的高层管理人员发放了调查问卷。47 家公司的员工对调查做出了回应,提供了 812 个建筑项目的相关信息。研究结果表明,在斯里兰卡的小型建筑项目中,RM 的应用程度较低。研究结果进一步表明,与私人建筑项目相比,公共建筑项目中的令吉实施率相对较高。通过调查发现,实施 RM 的主要障碍有"研究的局限性/影响本研究仅限于探讨在斯里兰卡小型建筑项目中实施 RM 的情况。研究对象仅限于在斯里兰卡建筑业发展局注册的财务限额在 1.5 亿卢比(约合 45 万美元以下)以下的建筑公司。斯里兰卡建筑业在实施新的管理技术(如 RM 和价值管理)方面也是一个探索较少的领域。研究采用的定量方法显示,小型建筑项目中 RM 的实施程度较低。此外,本研究还发现了一些与 RM 实施相关的障碍。这些发现将有助于建筑利益相关者克服公认的障碍,并在各自的建筑项目中有效使用 RM。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Problematic issues emerging during BIM implementation process in construction organizations Problematic issues emerging during BIM implementation process in construction organizations Awareness of net zero energy buildings among construction professionals in the Ghanaian construction industry Development of a blockchain-based embodied carbon estimator Carbon emission reduction in construction industry: qualitative insights on procurement, policies and artificial intelligence
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1