{"title":"Operation of hydropower plants without storage by optimizing the turbine flow. Variations to the optimization model","authors":"Juan Manuel Blanco","doi":"10.56845/rebs.v6i1.89","DOIUrl":null,"url":null,"abstract":"Flowing water power plants take advantage of the flows that circulate through the river in which they are implanted. They do not have in their design storage systems that allow the accumulation of river flows for later use. They only have the infrastructures necessary for the conduction of flows and their use. These types of plants are designed and automated to operate between certain flow limits, working with \"constant head\", using the available flows at any given time. The operating limits are set by the \"equipment flow\", for which the plant is designed, and the \"technical minimum flow\", which corresponds to the minimum flow value with which the plant can work, and which depends on each turbine type. This article is a continuation of the research carried out and part of the results of which have been presented in previous congresses. They established the optimization algorithms to take advantage of times of low flow level (dry season) to use the plant's channels as a storage element for flow rates below the technical minimum and to subject the plant to sequential emptying/filling cycles of the same channels, thus allowing energy recovery, which we will call operation by \"optimal flow\". This article intends to analyze the response of the proposed optimization model to variations in both the design and operation of the power plants in which its implementation is possible. The response of the plant to variations in the usable volume in the channels, the minimum time established for the operation of the plant, as well as the hydrological characteristics of the year of application is presented.","PeriodicalId":194964,"journal":{"name":"Renewable Energy, Biomass & Sustainability","volume":"42 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Renewable Energy, Biomass & Sustainability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56845/rebs.v6i1.89","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Flowing water power plants take advantage of the flows that circulate through the river in which they are implanted. They do not have in their design storage systems that allow the accumulation of river flows for later use. They only have the infrastructures necessary for the conduction of flows and their use. These types of plants are designed and automated to operate between certain flow limits, working with "constant head", using the available flows at any given time. The operating limits are set by the "equipment flow", for which the plant is designed, and the "technical minimum flow", which corresponds to the minimum flow value with which the plant can work, and which depends on each turbine type. This article is a continuation of the research carried out and part of the results of which have been presented in previous congresses. They established the optimization algorithms to take advantage of times of low flow level (dry season) to use the plant's channels as a storage element for flow rates below the technical minimum and to subject the plant to sequential emptying/filling cycles of the same channels, thus allowing energy recovery, which we will call operation by "optimal flow". This article intends to analyze the response of the proposed optimization model to variations in both the design and operation of the power plants in which its implementation is possible. The response of the plant to variations in the usable volume in the channels, the minimum time established for the operation of the plant, as well as the hydrological characteristics of the year of application is presented.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过优化水轮机流量来运行无蓄水的水电站。优化模型的变化
流水发电厂利用的是其所在河流的循环水流。在设计中,水电站没有蓄水系统,无法蓄积河水以供日后使用。它们只拥有引导水流和利用水流所需的基础设施。这类水电站的设计和自动化程度都很高,可以在一定流量范围内运行,以 "恒定水头 "工作,随时利用现有流量。运行限值由 "设备流量 "和 "最小技术流量 "确定,前者是水电站的设计目标,后者则是水电站能够工作的最小流量值,取决于每种类型的水轮机。本文是已开展研究的延续,部分研究成果已在前几届大会上进行了介绍。他们建立了优化算法,利用低流量时段(旱季),在流量低于技术最小值时将发电厂的水渠用作储存装置,并使发电厂在同一水渠中进行连续的排空/充水循环,从而实现能量回收,我们称之为 "最佳流量 "运行。本文旨在分析所提出的优化模型对发电厂设计和运行变化的响应。文章介绍了电站对渠道可用容量、电站运行的最短时间以及应用年份的水文特征等变化的响应。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Factibilidad legal del uso de humedales construidos para el tratamiento de aguas residuales en viviendas de interés social en Xalapa, Veracruz, México. Regulations for Bat Protection in Mexico's Wind Farms Evolution and Trends in the Circular Economy: A Meta-Analysis from 2018 to 2024 An open-loop control algorithm for improved tracking in a heliostat Kinetic parameters of Lactobacillus acidophilus growth in the lactic fermentation of non-centrifugal cane sugar agroindustry wastes
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1