{"title":"Losses Resulting from Exceeding the Specified Time for Completion and Its Impact on the Status of the Project and Delay in Utilizing Services","authors":"Abdulrahman Al-Mafrachi, S. Naimi","doi":"10.18280/mmep.110212","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":37338,"journal":{"name":"Mathematical Modelling of Engineering Problems","volume":"60 12","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mathematical Modelling of Engineering Problems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18280/mmep.110212","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}