Ready Mix Concrete Production Scheduling and Truck Mixer Allocation Using Genetic Algorithm: A Case Study

Maria Krisnawati, Fadhila Rifda Azka Syailendri, A. A. Sibarani
{"title":"Ready Mix Concrete Production Scheduling and Truck Mixer Allocation Using Genetic Algorithm: A Case Study","authors":"Maria Krisnawati, Fadhila Rifda Azka Syailendri, A. A. Sibarani","doi":"10.4028/p-4kfzgm","DOIUrl":null,"url":null,"abstract":"The XYZ company is engaged in the production of construction materials such as Ready-Mix Concrete (RMC). XYZ company must increase productivity in order to compete with the industry’s rapid expansion in Banyumas, Indonesia. Scheduling production is one of the methods for boosting productivity. Utilizing a mathematical model and a single-machine approach, scheduling is arranged. Using a product delivery system that is integrated with the production process, a production scheduling model and allocation of product delivery vehicles, the Truck Mixer, are developed. The Genetic Algorithm is used to find a more effective scheduling solution. The results of this study indicate that the schedule generated by the genetic algorithm has a total reduction of ten job sequence completion times of 134363 seconds or 24% more efficient than the existing schedule on average.","PeriodicalId":512976,"journal":{"name":"Engineering Headway","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-04-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Headway","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4028/p-4kfzgm","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The XYZ company is engaged in the production of construction materials such as Ready-Mix Concrete (RMC). XYZ company must increase productivity in order to compete with the industry’s rapid expansion in Banyumas, Indonesia. Scheduling production is one of the methods for boosting productivity. Utilizing a mathematical model and a single-machine approach, scheduling is arranged. Using a product delivery system that is integrated with the production process, a production scheduling model and allocation of product delivery vehicles, the Truck Mixer, are developed. The Genetic Algorithm is used to find a more effective scheduling solution. The results of this study indicate that the schedule generated by the genetic algorithm has a total reduction of ten job sequence completion times of 134363 seconds or 24% more efficient than the existing schedule on average.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用遗传算法进行预拌混凝土生产调度和搅拌车分配:案例研究
XYZ 公司从事预拌混凝土 (RMC) 等建筑材料的生产。XYZ 公司必须提高生产率,才能与印尼班尤马斯快速扩张的行业竞争。安排生产是提高生产率的方法之一。利用数学模型和单机方法安排生产计划。利用与生产流程相结合的产品交付系统,开发了生产调度模型和产品交付车辆(搅拌车)的分配。利用遗传算法找到了更有效的排产方案。研究结果表明,遗传算法生成的排程共减少了 10 个作业序列的完成时间 134363 秒,比现有排程平均高效 24%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Recent Advancements in Materials, Design and Manufacturing (ICRAMDM-2023) Formation Conditions and Distribution Law of Tight Oil in Fuyu Oil Layer, Sanzhao Area, Songliao Basin Genetic Bat Algorithm-Based Multi-Objective Selective Disassembly Sequence Planning Characterization of the Hydrodynamics of Fine Channel Erosion on Slopes Based on Transparent Soil Test to Carry out Research on the Soil Stability Discrimination under the Suffusion
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1