{"title":"Flowshop Production Scheduling Using the Campbell, Dudek, Smith (CDS), Palmer, and Dannenbring Methods to Minimize the Total Production Time (Case Study: PT. Naturindo Fresh Kulon Progo, Indonesia)","authors":"Taufik Alfuad, Khusna Dwijayanti","doi":"10.4028/p-ps93tq","DOIUrl":null,"url":null,"abstract":"PT. Naturindo Fresh is a company that produces and distributes original Indonesian herbal medicines. The company does not have a planned schedule to minimize the total production time. The production is carried out by considering the products stock and the number of orders from consumers. The employees are free to randomly choose which products will be produced first. The purpose of this research is to determine the job sequence and calculating the total production time (makespan), and identify the sequence that create smallest makespan. The methods used in this research are Campbell, Dudek, & Smith (CDS) method, Palmer method, and Dannenbring method. The calculation results shows that the company's actual scheduling produces a makespan of 30,725.08 minutes. The result of CDS method produces the makespan of 30,634.18 minutes. Palmer's method produces the makespan of 30,743.75 minutes, and the Dannenbring method also yield the makespan of 30,743.75 minutes. In conclusion, the job scheduling with CDS method has the smallest makespan which is recommended to be applied in the company to minimize the total production time.","PeriodicalId":512976,"journal":{"name":"Engineering Headway","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-04-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Headway","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4028/p-ps93tq","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT. Naturindo Fresh is a company that produces and distributes original Indonesian herbal medicines. The company does not have a planned schedule to minimize the total production time. The production is carried out by considering the products stock and the number of orders from consumers. The employees are free to randomly choose which products will be produced first. The purpose of this research is to determine the job sequence and calculating the total production time (makespan), and identify the sequence that create smallest makespan. The methods used in this research are Campbell, Dudek, & Smith (CDS) method, Palmer method, and Dannenbring method. The calculation results shows that the company's actual scheduling produces a makespan of 30,725.08 minutes. The result of CDS method produces the makespan of 30,634.18 minutes. Palmer's method produces the makespan of 30,743.75 minutes, and the Dannenbring method also yield the makespan of 30,743.75 minutes. In conclusion, the job scheduling with CDS method has the smallest makespan which is recommended to be applied in the company to minimize the total production time.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用坎贝尔、杜德克、史密斯 (CDS)、帕尔默和丹能布林方法进行流水线生产调度,最大限度地缩短总生产时间(案例研究:PT. Naturindo Fresh Kulon Progo,印度尼西亚)
PT.Naturindo Fresh 是一家生产和销售印尼原产草药的公司。该公司没有计划时间表,以尽量缩短总生产时间。生产是根据产品库存和消费者订单数量进行的。员工可以随机选择先生产哪些产品。本研究的目的是确定工作顺序,计算总生产时间(makespan),并找出产生最小生产时间的顺序。本研究采用的方法有坎贝尔、杜德克和史密斯(CDS)法、帕尔默法和丹能布林法。计算结果显示,该公司的实际排程产生了 30725.08 分钟的生产间隔。CDS 方法的计算结果为 30634.18 分钟。帕尔默方法的计算结果为 30743.75 分钟,丹宁布林方法的计算结果也是 30743.75 分钟。总之,采用 CDS 方法的作业调度具有最小的时间跨度,建议在公司中应用,以最大限度地减少总生产时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Recent Advancements in Materials, Design and Manufacturing (ICRAMDM-2023) Formation Conditions and Distribution Law of Tight Oil in Fuyu Oil Layer, Sanzhao Area, Songliao Basin Genetic Bat Algorithm-Based Multi-Objective Selective Disassembly Sequence Planning Characterization of the Hydrodynamics of Fine Channel Erosion on Slopes Based on Transparent Soil Test to Carry out Research on the Soil Stability Discrimination under the Suffusion
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1