Effect of Monitoring and Evaluation Practices and Urban Water Sustainability Project in Rwanda: A Case of WASAC Project in Kigali City

Geofrey Kamugisha
{"title":"Effect of Monitoring and Evaluation Practices and Urban Water Sustainability Project in Rwanda: A Case of WASAC Project in Kigali City","authors":"Geofrey Kamugisha","doi":"10.53819/81018102t4265","DOIUrl":null,"url":null,"abstract":"In Rwanda, projects failure is caused by lack of Monitoring and Evaluation staff trainings, technical expertise, design/approach, low level stakeholder involvement, lack of proper planning, lack of supportive supervision, insufficient financial management and poor leadership on feasibility and sustainability project. The general objective of the study is to assess monitoring and evaluation practices and urban water sustainability project in Rwanda. A case of WASAC project in Kigali city and the specific objectives of the study were to assess the influence of project monitoring and evaluation planning on urban water sustainability project in Rwanda, to assess the influence of monitoring and evaluation stakeholders involvement on urban water sustainability project in Rwanda and to determine the effect of monitoring and evaluation trainings on urban water sustainability project in Rwanda. The study was based on two theories such as theory of change and theory of constraints. In this study, a descriptive research design was used and the targeted population includes project management team, project monitoring and evaluation officials, project analysts and engineers. In total they were184 from whom a sample size of 126 was selected as representative of total population. Therefore, a simple sampling technique will be used and data will be collected using questionnaire, interview and documentation. The analysis of data will be done through SPSS version 21. The study findings showed that stakeholders’ involvement is essential in achieving urban water sustainability in the way that M&E planning contribution is at the mean of 3.908 and standard deviation of 0.755, stakeholders involvement contributed to urban water sustainability at the mean of 3.275 and standard deviation of 0.642 while M&E trainings has contributed to urban water sustainability at the mean of4.505 and standard deviation of 0.720 The study found that there are continuous M&E trainings and development of the project staff to acquire skills to implement the project. The study recommended that effective project planning need to be put in place by the project team and managers. Project team should ensure their monitoring and evaluation control plan align with M&E plan. The study recommends a sound stakeholders’ involvement at each phase of the project from initial phase to execution. Keywords: Monitoring and Evaluation, Urban Water Sustainability, WASAC, Project Management, Kigali City Infrastructure","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"2 ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Entrepreneurship & Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t4265","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In Rwanda, projects failure is caused by lack of Monitoring and Evaluation staff trainings, technical expertise, design/approach, low level stakeholder involvement, lack of proper planning, lack of supportive supervision, insufficient financial management and poor leadership on feasibility and sustainability project. The general objective of the study is to assess monitoring and evaluation practices and urban water sustainability project in Rwanda. A case of WASAC project in Kigali city and the specific objectives of the study were to assess the influence of project monitoring and evaluation planning on urban water sustainability project in Rwanda, to assess the influence of monitoring and evaluation stakeholders involvement on urban water sustainability project in Rwanda and to determine the effect of monitoring and evaluation trainings on urban water sustainability project in Rwanda. The study was based on two theories such as theory of change and theory of constraints. In this study, a descriptive research design was used and the targeted population includes project management team, project monitoring and evaluation officials, project analysts and engineers. In total they were184 from whom a sample size of 126 was selected as representative of total population. Therefore, a simple sampling technique will be used and data will be collected using questionnaire, interview and documentation. The analysis of data will be done through SPSS version 21. The study findings showed that stakeholders’ involvement is essential in achieving urban water sustainability in the way that M&E planning contribution is at the mean of 3.908 and standard deviation of 0.755, stakeholders involvement contributed to urban water sustainability at the mean of 3.275 and standard deviation of 0.642 while M&E trainings has contributed to urban water sustainability at the mean of4.505 and standard deviation of 0.720 The study found that there are continuous M&E trainings and development of the project staff to acquire skills to implement the project. The study recommended that effective project planning need to be put in place by the project team and managers. Project team should ensure their monitoring and evaluation control plan align with M&E plan. The study recommends a sound stakeholders’ involvement at each phase of the project from initial phase to execution. Keywords: Monitoring and Evaluation, Urban Water Sustainability, WASAC, Project Management, Kigali City Infrastructure
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
卢旺达监测与评估实践和城市水资源可持续性项目的效果:基加利市 WASAC 项目案例
在卢旺达,项目失败的原因包括缺乏对监测与评估人员的培训、技术专业知识、设计/方 法、利益相关者参与程度低、缺乏适当的规划、缺乏支持性监督、财务管理不足以及对可行 性和可持续性项目的领导不力。本研究的总体目标是评估卢旺达的监测和评估实践以及城市水资源可持续性项目。以基加利市的 WASAC 项目为例,研究的具体目标是评估项目监测和评估规划对卢旺达城市水资源可持续发展项目的影响,评估监测和评估利益相关者的参与对卢旺达城市水资源可持续发展项目的影响,以及确定监测和评估培训对卢旺达城市水资源可持续发展项目的影响。本研究基于两个理论,如变革理论和制约理论。本研究采用描述性研究设计,目标人群包括项目管理团队、项目监测与评估官员、项目分析师和工程师。他们总共有 184 人,从中抽取了 126 人作为样本,作为总人口的代表。因此,将采用简单抽样技术,并通过问卷、访谈和文献收集数据。数据分析将通过 SPSS 21 版本完成。研究结果表明,利益相关者的参与对实现城市水资源的可持续发展至关重要,监测和评价规划的平均值为 3.908,标准差为 0.755;利益相关者的参与对城市水资源的可持续发展的平均值为 3.275,标准差为 0.642;监测和评价培训对城市水资源的可持续发展的平均值为 4.505,标准差为 0.720。研究建议,项目团队和管理人员应制定有效的项目规划。项目小组应确保其监测和评估控制计划与监测和评估计划相一致。研究建议在项目从初始阶段到执行阶段的每个阶段都要有利益相关者的充分参与。关键词监测与评估、城市供水可持续性、WASAC、项目管理、基加利城市基础设施
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Project Contractors’ Capacity and Performance of Road Construction Projects in Uasin Gishu County, Kenya Effect of Project Management Practices on Project Performance, Case of USAID Soma Umenye Project in Nyamagabe District, Rwanda Influence of Agricultural Project Management Practices on Agricultural Production: Case Study of Musanze District, Rwanda Effect of Risk Management on Success of Workers Affordable Properties Ltd (2017-2022) The Effect of Risk Management Practices on Organizational Performance at Prime Insurance Ltd, Rwanda
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1