Mitigating Co-Activity Conflicts and Resource Overallocation in Construction Projects: A Modular Heuristic Scheduling Approach with Primavera P6 EPPM Integration

Algorithms Pub Date : 2024-05-24 DOI:10.3390/a17060230
Khwansiri Ninpan, Shuzhang Huang, Francesco Vitillo, Mohamad Ali Assaad, Lies Benmiloud Bechet, Robert Plana
{"title":"Mitigating Co-Activity Conflicts and Resource Overallocation in Construction Projects: A Modular Heuristic Scheduling Approach with Primavera P6 EPPM Integration","authors":"Khwansiri Ninpan, Shuzhang Huang, Francesco Vitillo, Mohamad Ali Assaad, Lies Benmiloud Bechet, Robert Plana","doi":"10.3390/a17060230","DOIUrl":null,"url":null,"abstract":"This paper proposes a heuristic approach for managing complex construction projects. The tool incorporates Primavera P6 EPPM and Synchro 4D, enabling proactive clash detection and resolution of spatial conflicts during concurrent tasks. Additionally, it performs resource verification for sufficient allocation before task initiation. This integrated approach facilitates the generation of conflict-free and feasible construction schedules. By adhering to project constraints and seamlessly integrating with existing industry tools, the proposed solution offers a comprehensive and robust approach to construction project management. This constitutes, to our knowledge, the first dynamic digital twin for the delivery of a complex project.","PeriodicalId":502609,"journal":{"name":"Algorithms","volume":"66 23","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Algorithms","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/a17060230","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper proposes a heuristic approach for managing complex construction projects. The tool incorporates Primavera P6 EPPM and Synchro 4D, enabling proactive clash detection and resolution of spatial conflicts during concurrent tasks. Additionally, it performs resource verification for sufficient allocation before task initiation. This integrated approach facilitates the generation of conflict-free and feasible construction schedules. By adhering to project constraints and seamlessly integrating with existing industry tools, the proposed solution offers a comprehensive and robust approach to construction project management. This constitutes, to our knowledge, the first dynamic digital twin for the delivery of a complex project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
缓解建筑项目中的共同活动冲突和资源过度分配:与 Primavera P6 EPPM 集成的模块化启发式排程方法
本文提出了一种管理复杂建筑项目的启发式方法。该工具结合了 Primavera P6 EPPM 和 Synchro 4D,可在并发任务期间主动检测冲突并解决空间冲突。此外,该工具还能在任务启动前进行资源核查,以便充分分配资源。这种集成方法有助于生成无冲突、可行的施工进度计划。通过遵守项目约束条件并与现有行业工具无缝集成,所提出的解决方案为建筑项目管理提供了一种全面而稳健的方法。据我们所知,这是首个用于交付复杂项目的动态数字孪生系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Label-Setting Algorithm for Multi-Destination K Simple Shortest Paths Problem and Application A Quantum Approach for Exploring the Numerical Results of the Heat Equation Enhancing Indoor Positioning Accuracy with WLAN and WSN: A QPSO Hybrid Algorithm with Surface Tessellation Trajectory Classification and Recognition of Planar Mechanisms Based on ResNet18 Network Computational Test for Conditional Independence
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1