OPTIMIZATION SCHEDULING PROJECT REHABILITATION BUILDING AND HALL DEKRANASDA AND KALIMANTAN BARAT MUSEUM FENCE USING CRITICAL PATH METHOD (CPM)

Layla Mutiara Halim, Lusiana Lusiana, Safarudin M Nuh
{"title":"OPTIMIZATION SCHEDULING PROJECT REHABILITATION BUILDING AND HALL DEKRANASDA AND KALIMANTAN BARAT MUSEUM FENCE USING CRITICAL PATH METHOD (CPM)","authors":"Layla Mutiara Halim, Lusiana Lusiana, Safarudin M Nuh","doi":"10.26418/jts.v24i2.75578","DOIUrl":null,"url":null,"abstract":"This study investigates the optimization of project scheduling using the Critical Path Method (CPM) in construction projects. Focusing on the Building Rehabilitation Project, Dekranasda Hall, and Kalimantan Barat Museum Fence, the research aims to reduce project duration without altering costs. CPM is employed to map out activities in a network, identifying the critical path to enhance time management. The initial project duration was 249 days. By breaking down work items and increasing the number of workers in critical activities, the duration was reduced to 125 days. Optimization involved dividing tasks into manageable segments and determining the appropriate workforce through trial and error. The study demonstrates that effective project scheduling and resource allocation can significantly reduce completion time, highlighting CPM's value in project management for achieving efficiency and meeting deadlines. The findings emphasize the importance of detailed planning, dependency logic, and continuous monitoring to optimize construction project timelines.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/jts.v24i2.75578","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study investigates the optimization of project scheduling using the Critical Path Method (CPM) in construction projects. Focusing on the Building Rehabilitation Project, Dekranasda Hall, and Kalimantan Barat Museum Fence, the research aims to reduce project duration without altering costs. CPM is employed to map out activities in a network, identifying the critical path to enhance time management. The initial project duration was 249 days. By breaking down work items and increasing the number of workers in critical activities, the duration was reduced to 125 days. Optimization involved dividing tasks into manageable segments and determining the appropriate workforce through trial and error. The study demonstrates that effective project scheduling and resource allocation can significantly reduce completion time, highlighting CPM's value in project management for achieving efficiency and meeting deadlines. The findings emphasize the importance of detailed planning, dependency logic, and continuous monitoring to optimize construction project timelines.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用关键路径法(CPM)优化德克拉纳斯达和加里曼丹巴拉特博物馆围栏修复大楼和大厅项目的进度安排
本研究探讨了在建筑项目中使用关键路径法(CPM)优化项目进度的问题。该研究以建筑修复项目、Dekranasda Hall 和加里曼丹巴拉特博物馆围栏为重点,旨在缩短项目工期而不改变成本。CPM 被用来绘制网络中的活动图,确定关键路径以加强时间管理。最初的项目工期为 249 天。通过分解工作项目和增加关键活动中的工人数量,工期缩短至 125 天。优化工作包括将任务划分为可管理的部分,并通过反复试验确定适当的劳动力。这项研究表明,有效的项目进度安排和资源分配可以大大缩短完工时间,突出了 CPM 在项目管理中提高效率和遵守期限的价值。研究结果强调了详细规划、依赖逻辑和持续监控对优化施工项目时间的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
PLANNING FOR THE DEVELOPMENT OF A DRINKING WATER DISTRIBUTION SYSTEM NETWORK IN SUNGAI PINYUH DETERMINATION OF DISCHARGE COEFFICIENT THROUGH LABORATORY TESTING USING BROAD-CRESTED WEIR DETERMINATION OF REPRESENTATIVE MOCK MODEL PARAMETERS FOR MONTHLY DISCHARGE CURVE DEVELOPMENT IN THE UPPER KAPUAS RIVER BASIN FLOW HYDROGRAPH GENERATION FOR MELAWI SUB-WATERSHED USING THE SNYDER SYNTHETIC UNIT HYDROGRAPH MODEL BRACKISH WATER DESALINATION IN SUNGAI ITIK AREA USING REVERSE OSMOSIS (RO) METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1