{"title":"Unmanned ground vehicle (UGV) based automated construction progress measurement of road using LSTM","authors":"Tirth Patel, Brian H.W. Guo, Jacobus Daniel van der Walt, Yang Zou","doi":"10.1108/ecam-01-2024-0020","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>Current solutions for monitoring the progress of pavement construction (such as collecting, processing and analysing data) are inefficient, labour-intensive, time-consuming, tedious and error-prone. In this study, an automated solution proposes sensors prototype mounted unmanned ground vehicle (UGV) for data collection, an LSTM classifier for road layer detection, the integrated algorithm for as-built progress calculation and web-based as-built reporting.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>The crux of the proposed solution, the road layer detection model, is proposed to develop from the layer change detection model and rule-based reasoning. In the beginning, data were gathered using a UGV with a laser ToF (time-of-flight) distance sensor, accelerometer, gyroscope and GPS sensor in a controlled environment. The long short-term memory (LSTM) algorithm was utilised on acquired data to develop a classifier model for layer change detection, such as layer not changed, layer up and layer down.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>In controlled environment experiments, the classification of road layer changes achieved 94.35% test accuracy with 14.05% loss. Subsequently, the proposed approach, including the layer detection model, as-built measurement algorithm and reporting, was successfully implemented with a real case study to test the robustness of the model and measure the as-built progress.</p><!--/ Abstract__block -->\n<h3>Research limitations/implications</h3>\n<p>The implementation of the proposed framework can allow continuous, real-time monitoring of road construction projects, eliminating the need for manual, time-consuming methods. This study will potentially help the construction industry in the real time decision-making process of construction progress monitoring and controlling action.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>This first novel approach marks the first utilization of sensors mounted UGV for monitoring road construction progress, filling a crucial research gap in incremental and segment-wise construction monitoring and offering a solution that addresses challenges faced by Unmanned Aerial Vehicles (UAVs) and 3D reconstruction. Utilizing UGVs offers advantages like cost-effectiveness, safety and operational flexibility in no-fly zones.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"166 1","pages":""},"PeriodicalIF":3.6000,"publicationDate":"2024-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering, Construction and Architectural Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1108/ecam-01-2024-0020","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose
Current solutions for monitoring the progress of pavement construction (such as collecting, processing and analysing data) are inefficient, labour-intensive, time-consuming, tedious and error-prone. In this study, an automated solution proposes sensors prototype mounted unmanned ground vehicle (UGV) for data collection, an LSTM classifier for road layer detection, the integrated algorithm for as-built progress calculation and web-based as-built reporting.
Design/methodology/approach
The crux of the proposed solution, the road layer detection model, is proposed to develop from the layer change detection model and rule-based reasoning. In the beginning, data were gathered using a UGV with a laser ToF (time-of-flight) distance sensor, accelerometer, gyroscope and GPS sensor in a controlled environment. The long short-term memory (LSTM) algorithm was utilised on acquired data to develop a classifier model for layer change detection, such as layer not changed, layer up and layer down.
Findings
In controlled environment experiments, the classification of road layer changes achieved 94.35% test accuracy with 14.05% loss. Subsequently, the proposed approach, including the layer detection model, as-built measurement algorithm and reporting, was successfully implemented with a real case study to test the robustness of the model and measure the as-built progress.
Research limitations/implications
The implementation of the proposed framework can allow continuous, real-time monitoring of road construction projects, eliminating the need for manual, time-consuming methods. This study will potentially help the construction industry in the real time decision-making process of construction progress monitoring and controlling action.
Originality/value
This first novel approach marks the first utilization of sensors mounted UGV for monitoring road construction progress, filling a crucial research gap in incremental and segment-wise construction monitoring and offering a solution that addresses challenges faced by Unmanned Aerial Vehicles (UAVs) and 3D reconstruction. Utilizing UGVs offers advantages like cost-effectiveness, safety and operational flexibility in no-fly zones.
期刊介绍:
ECAM publishes original peer-reviewed research papers, case studies, technical notes, book reviews, features, discussions and other contemporary articles that advance research and practice in engineering, construction and architectural management. In particular, ECAM seeks to advance integrated design and construction practices, project lifecycle management, and sustainable construction. The journal’s scope covers all aspects of architectural design, design management, construction/project management, engineering management of major infrastructure projects, and the operation and management of constructed facilities. ECAM also addresses the technological, process, economic/business, environmental/sustainability, political, and social/human developments that influence the construction project delivery process.
ECAM strives to establish strong theoretical and empirical debates in the above areas of engineering, architecture, and construction research. Papers should be heavily integrated with the existing and current body of knowledge within the field and develop explicit and novel contributions. Acknowledging the global character of the field, we welcome papers on regional studies but encourage authors to position the work within the broader international context by reviewing and comparing findings from their regional study with studies conducted in other regions or countries whenever possible.