{"title":"Balanced assignments of periodic tasks","authors":"Héloïse Gachet, Frédéric Meunier","doi":"arxiv-2407.05485","DOIUrl":null,"url":null,"abstract":"This work deals with a problem of assigning periodic tasks to employees in\nsuch a way that each employee performs each task with the same frequency in the\nlong term. The motivation comes from a collaboration with the SNCF, the main\nFrench railway company. An almost complete solution is provided under the form\nof a necessary and sufficient condition that can be checked in polynomial time.\nA complementary discussion about possible extensions is also proposed.","PeriodicalId":501216,"journal":{"name":"arXiv - CS - Discrete Mathematics","volume":"46 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"arXiv - CS - Discrete Mathematics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/arxiv-2407.05485","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This work deals with a problem of assigning periodic tasks to employees in
such a way that each employee performs each task with the same frequency in the
long term. The motivation comes from a collaboration with the SNCF, the main
French railway company. An almost complete solution is provided under the form
of a necessary and sufficient condition that can be checked in polynomial time.
A complementary discussion about possible extensions is also proposed.