Parameter Estimation for a 500 kV Overhead Transmission Line and Analysis of Dead Time Prior to Single-Phase Automatic Reclosing Based on Synchrophasor Measurements
{"title":"Parameter Estimation for a 500 kV Overhead Transmission Line and Analysis of Dead Time Prior to Single-Phase Automatic Reclosing Based on Synchrophasor Measurements","authors":"I. E. Ivanov, Y. Umnov, V. F. Lachugin","doi":"10.1007/s10749-024-01791-1","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":509436,"journal":{"name":"Power Technology and Engineering","volume":"10 8","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Technology and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/s10749-024-01791-1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}