Scientific and methodological approach to the development of pilot testing projects for open-pit mining

M. Rylnikova, D.N. Oleinik, A.M. Fayskhanov
{"title":"Scientific and methodological approach to the development of pilot testing projects for open-pit mining","authors":"M. Rylnikova, D.N. Oleinik, A.M. Fayskhanov","doi":"10.30686/1609-9192-2024-3-112-117","DOIUrl":null,"url":null,"abstract":"Methodology of designing pilot tests in open-pit mining is a complex and insufficiently developed issue in the theory and practice of designing mining systems, which, as a rule, fails to take into account the mining and geological features of the deposits. The complex development of mineral deposits requires new methods of open-pit designing. Thus, the theoretical justification and development of the methods to determine the optimal parameters and indicators of open-pits during the design of pilot tests with the establishment of scales, deadlines, tasks and test conditions is an urgent research problem. The authors of the study have systematized the research trends in developing the basis for designing pilot tests in open-pit geotechnology. The level of geological inaccuracies in case of insufficiently reliable prospecting results leads to a decrease in the expected technical and economic indicators of the mining project ranging from 5-20% to several folds. When information on the deposit is insufficient, pilot test projects are prepared. This is done in order to obtain additional input data for preparation of the feasibility study of permanent conditions or at the stage of the field development to verify the created technologies and means of their mechanisation in order to avoid revision of the mining system parameters in the course of the field operations due to discrepancies between the geomechanical and hydrogeological representations given in the detailed exploration materials and the real conditions.","PeriodicalId":506182,"journal":{"name":"Mining Industry Journal (Gornay Promishlennost)","volume":"73 19","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Industry Journal (Gornay Promishlennost)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2024-3-112-117","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Methodology of designing pilot tests in open-pit mining is a complex and insufficiently developed issue in the theory and practice of designing mining systems, which, as a rule, fails to take into account the mining and geological features of the deposits. The complex development of mineral deposits requires new methods of open-pit designing. Thus, the theoretical justification and development of the methods to determine the optimal parameters and indicators of open-pits during the design of pilot tests with the establishment of scales, deadlines, tasks and test conditions is an urgent research problem. The authors of the study have systematized the research trends in developing the basis for designing pilot tests in open-pit geotechnology. The level of geological inaccuracies in case of insufficiently reliable prospecting results leads to a decrease in the expected technical and economic indicators of the mining project ranging from 5-20% to several folds. When information on the deposit is insufficient, pilot test projects are prepared. This is done in order to obtain additional input data for preparation of the feasibility study of permanent conditions or at the stage of the field development to verify the created technologies and means of their mechanisation in order to avoid revision of the mining system parameters in the course of the field operations due to discrepancies between the geomechanical and hydrogeological representations given in the detailed exploration materials and the real conditions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
制定露天采矿试点测试项目的科学方法论
露天开采试验设计方法是采矿系统设计理论和实践中一个复杂且发展不足的问题,通常没有考虑到矿床的开采和地质特征。复杂的矿藏开发需要新的露天开采设计方法。因此,亟待解决的研究课题是,在设计试点试验时,通过确定规模、期限、任务和试验条件,对确定露天矿最佳参数和指标的方法进行理论论证和开发。研究报告的作者系统地梳理了露天开采地质技术试验设计基础的研究趋势。在探矿结果不够可靠的情况下,地质误差水平会导致采矿项目的预期技术和经济指标下降 5-20% 至数倍不等。当矿藏信息不足时,就会准备试点测试项目。这样做是为了获得更多的输入数据,以准备永久性条件的可行性研究,或在实地开发阶段验证所创造的技术及其机械化手段,以避免在实地作业过程中由于详细勘探材料中提供的地质力学和水文地质表述与实际情况不符而修改采矿系统参数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A comparative strength analysis of diamond cable segments for stone cutting machines Prospects for increasing the mineral base of the non-ferrous metallurgy Production and utilization of magnesium oxide in the Russian Federation Perspectives of using satellite databases of greenhouse gas emissions in monitoring of mining facilities Issues related to implementation of big data analytical systems and other digitalization achievements to improve the business efficiency of mining companies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1