CRITICAL ANALYSIS OF CONTRACTUAL ADDENDUM IN PUBLIC SERVICES

Fernanda Siqueira Prado, L. Cezarino, L. Liboni, Lucas Conde Stocco, F. Martins, Geraldo José Ferraresi de Araújo
{"title":"CRITICAL ANALYSIS OF CONTRACTUAL ADDENDUM IN PUBLIC SERVICES","authors":"Fernanda Siqueira Prado, L. Cezarino, L. Liboni, Lucas Conde Stocco, F. Martins, Geraldo José Ferraresi de Araújo","doi":"10.13059/racef.v15i2.1050","DOIUrl":null,"url":null,"abstract":"In the execution of public services, the incidence of contractual terms and value additions is a strong indication of failures in the execution of the planning phase by the public management. This work aims to investigate the existence of flaws in the public contracting process, in the period from 2009 to 2011, as well as the main causes of discrepancies, with values and deadlines, from those foreseen when the bidding process took place. We conducted a case study based on the Mineiro Triangulum Federal Institute (IFMT). The results confirmed the existence of a critical problem by revealing that 100% of the services analyzed presented an addendum for deadline extension and value increase of the total project. On average, the execution time of the analyzed works was 6.5 (six and a half) times longer, as well as the final cost was 23% higher than planned. The results obtained demonstrated that the main factors causing contractual amendments are time and value. We also identified that the conception and preparation of basic projects represent the main problems in the construction services provided by public management in the studied case.","PeriodicalId":471734,"journal":{"name":"Revista de Administração, Contabilidade e Economia da Fundace","volume":" 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista de Administração, Contabilidade e Economia da Fundace","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.13059/racef.v15i2.1050","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the execution of public services, the incidence of contractual terms and value additions is a strong indication of failures in the execution of the planning phase by the public management. This work aims to investigate the existence of flaws in the public contracting process, in the period from 2009 to 2011, as well as the main causes of discrepancies, with values and deadlines, from those foreseen when the bidding process took place. We conducted a case study based on the Mineiro Triangulum Federal Institute (IFMT). The results confirmed the existence of a critical problem by revealing that 100% of the services analyzed presented an addendum for deadline extension and value increase of the total project. On average, the execution time of the analyzed works was 6.5 (six and a half) times longer, as well as the final cost was 23% higher than planned. The results obtained demonstrated that the main factors causing contractual amendments are time and value. We also identified that the conception and preparation of basic projects represent the main problems in the construction services provided by public management in the studied case.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
对公共服务合同附录的批判性分析
在公共服务的执行过程中,合同条款和附加值的发生是公共管理部门在执行规划阶段失误的有力证明。这项工作旨在调查 2009 年至 2011 年期间公共合同签订过程中存在的缺陷,以及造成价值和期限与招标时预期不符的主要原因。我们以米内罗三角联邦研究所(IFMT)为基础进行了案例研究。研究结果表明,100% 的分析服务都需要提交一份附录,以延长期限并增加项目总价值,从而证实了关键问题的存在。所分析工程的执行时间平均延长了 6.5 倍,最终成本比计划高出 23%。结果表明,造成合同修改的主要因素是时间和价值。我们还发现,在所研究的案例中,基本项目的构思和准备是公共管理部门提供的建筑服务中存在的主要问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
DIVERSIDADE RACIAL IMPORTA? UMA REVISÃO BIBLIOMÉTRICA DA PRODUÇÃO CIENTÍFICA GLOBAL SOBRE GESTÃO DA DIVERSIDADE DE 1990 A 2022 ESTUDO BIBLIOMÉTRICO SOBRE FRAMEWORKS PARA IMPLEMENTAÇÃO DA ECONOMIA CIRCULAR EM ORGANIZAÇÕES UM MAR DE LAMA: HÁ IMPACTO NO VALOR DE MERCADO DA VALE S/A PÓS DESASTRES? INFLUÊNCIA DOS PRINCÍPIOS E VALORES DO COOPERATIVISMO NA RELAÇÃO ENTRE GOVERNANÇA CORPORATIVA E TRIPÉ DA SUSTENTABILIDADE CAPACIDADE ABSORTIVA E SISTEMAS DE CONTROLE DE GESTÃO: UMA ARTICULAÇÃO POSSÍVEL? ANÁLISE DOS ESTUDOS NA INDÚSTRIA DE SERVIÇOS E SERVIÇOS HOTELEIROS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1