Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system

IF 4.7 3区 工程技术 Q2 ENERGY & FUELS Energy Reports Pub Date : 2024-08-09 DOI:10.1016/j.egyr.2024.08.003
Jasmin Søgaard-Deakin, George Xydis
{"title":"Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system","authors":"Jasmin Søgaard-Deakin, George Xydis","doi":"10.1016/j.egyr.2024.08.003","DOIUrl":null,"url":null,"abstract":"Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.","PeriodicalId":11798,"journal":{"name":"Energy Reports","volume":null,"pages":null},"PeriodicalIF":4.7000,"publicationDate":"2024-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Reports","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1016/j.egyr.2024.08.003","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
关于 "Power-to-X "最佳选址的预可行性研究:丹麦能源系统实验
丹麦制定了到 2030 年将温室气体排放量减少 70% 的宏伟目标,为实现这一目标,丹麦能源署提出了 Power-to-X 战略,其中包括到 2030 年电解总产能达到 6 GW 的目标。以下研究的目的是作为预可行性分析,确定 Power-to-X 电解槽的最佳选址。研究结果表明,Jammerbugt 是一个理想的地区,可作为现有风力涡轮机的附加解决方案,有 1303 h 的多余风能可用于 Power-to-X 项目。财务分析表明,20 年后的净现值为 -126,032 欧元,理论上 20% 的政府补贴可使净现值提高到 16,662 欧元。因此,研究发现,"Power-to-X "作为一个可行的商业案例,目前仍然依赖于政府的支持。研究结果强调了这种支持对于 "电力到X "成为可行商业案例的重要性,例如到 2030 年为氢气生产拨款 12.5 亿丹麦克朗的决定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Energy Reports
Energy Reports Energy-General Energy
CiteScore
8.20
自引率
13.50%
发文量
2608
审稿时长
38 days
期刊介绍: Energy Reports is a new online multidisciplinary open access journal which focuses on publishing new research in the area of Energy with a rapid review and publication time. Energy Reports will be open to direct submissions and also to submissions from other Elsevier Energy journals, whose Editors have determined that Energy Reports would be a better fit.
期刊最新文献
Optimizing technological configurations in residential energy systems with vehicle-to-home integration and community-level power sharing Corrigendum to “Load forecasting method based on CNN and extended LSTM”, [Energy Rep., vol. 12, December 2024, Pages 2452–2461] Application of wavelet and seasonal-based emotional ANN (EANN) models to predict solar irradiance Corrigendum to “Design and implementation of an autonomous device with an app to monitor the performance of photovoltaic panels” [Energy Rep. 12 (2024) 2498–2510] Biogas generation from food waste through anaerobic digestion technology with emphasis on enhancing circular economy in Sub-Saharan Africa – A review
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1