The implementation of a cost-efficient damped AC testing methodology for transmission cables based on DC–AC conversion and distributed partial discharge detection

IF 2 4区 工程技术 Q3 ENGINEERING, ELECTRICAL & ELECTRONIC Iet Generation Transmission & Distribution Pub Date : 2024-09-23 DOI:10.1049/gtd2.13272
Yuxin Lu, Hongjie Li, Yu Zhang, Jing Hu, Lin Yin, Weisheng He, Nianping Yan, Tangbing Li, Jianzhang Zou, Yuan Yan, Longwu Zhou
{"title":"The implementation of a cost-efficient damped AC testing methodology for transmission cables based on DC–AC conversion and distributed partial discharge detection","authors":"Yuxin Lu,&nbsp;Hongjie Li,&nbsp;Yu Zhang,&nbsp;Jing Hu,&nbsp;Lin Yin,&nbsp;Weisheng He,&nbsp;Nianping Yan,&nbsp;Tangbing Li,&nbsp;Jianzhang Zou,&nbsp;Yuan Yan,&nbsp;Longwu Zhou","doi":"10.1049/gtd2.13272","DOIUrl":null,"url":null,"abstract":"<p>This research introduces a novel damped alternating current (DAC) testing methodology, which integrates an enhanced DAC generator with a pulse-based distributed partial discharge (PD) detection technique. The advanced DAC generator is designed without the need for high voltage (HV) solid-state switches, thereby offering a cost-effective solution for field-testing voltage generation through a direct current–alternating current conversion approach. To meet the demand for high instantaneous power, a capacitor bank is employed as the power supply. Furthermore, the implementation of a distributed PD detection technique enhances sensitivity and eliminates limitations associated with cable length. To minimize the construction costs of the distributed PD-detection system, a pulse synchronization technique has been employed. Efforts to reduce the system's weight were informed by simulations, resulting in the design and development of a prototype weighing 850 kg for a 64/110 kV power cable. The reduction in the number of HV solid-state switches contributes to significant cost savings, amounting to tens of thousands of dollars, when compared to conventional DAC generators. Laboratory and field tests validated the effectiveness of the cost-efficient DAC testing methodology.</p>","PeriodicalId":13261,"journal":{"name":"Iet Generation Transmission & Distribution","volume":null,"pages":null},"PeriodicalIF":2.0000,"publicationDate":"2024-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13272","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iet Generation Transmission & Distribution","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13272","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

This research introduces a novel damped alternating current (DAC) testing methodology, which integrates an enhanced DAC generator with a pulse-based distributed partial discharge (PD) detection technique. The advanced DAC generator is designed without the need for high voltage (HV) solid-state switches, thereby offering a cost-effective solution for field-testing voltage generation through a direct current–alternating current conversion approach. To meet the demand for high instantaneous power, a capacitor bank is employed as the power supply. Furthermore, the implementation of a distributed PD detection technique enhances sensitivity and eliminates limitations associated with cable length. To minimize the construction costs of the distributed PD-detection system, a pulse synchronization technique has been employed. Efforts to reduce the system's weight were informed by simulations, resulting in the design and development of a prototype weighing 850 kg for a 64/110 kV power cable. The reduction in the number of HV solid-state switches contributes to significant cost savings, amounting to tens of thousands of dollars, when compared to conventional DAC generators. Laboratory and field tests validated the effectiveness of the cost-efficient DAC testing methodology.

Abstract Image

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于直流-交流转换和分布式局部放电检测的输电电缆阻尼交流测试方法的实施具有成本效益
这项研究介绍了一种新型阻尼交流电(DAC)测试方法,它将增强型 DAC 发生器与基于脉冲的分布式局部放电(PD)检测技术相结合。先进的 DAC 发生器在设计时无需使用高压(HV)固态开关,从而通过直流-交变电流转换方法为现场测试电压生成提供了经济高效的解决方案。为满足对高瞬时功率的需求,采用了电容器组作为电源。此外,分布式 PD 检测技术的实施提高了灵敏度,并消除了与电缆长度相关的限制。为了最大限度地降低分布式 PD 检测系统的建设成本,采用了脉冲同步技术。为减轻系统重量所做的努力是通过模拟来实现的,最终设计和开发出的原型重量为 850 千克,适用于 64/110 千伏电力电缆。与传统的 DAC 发电机相比,高压固态开关数量的减少大大降低了成本,节省了数万美元。实验室和现场测试验证了经济高效的 DAC 测试方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Iet Generation Transmission & Distribution
Iet Generation Transmission & Distribution 工程技术-工程:电子与电气
CiteScore
6.10
自引率
12.00%
发文量
301
审稿时长
5.4 months
期刊介绍: IET Generation, Transmission & Distribution is intended as a forum for the publication and discussion of current practice and future developments in electric power generation, transmission and distribution. Practical papers in which examples of good present practice can be described and disseminated are particularly sought. Papers of high technical merit relying on mathematical arguments and computation will be considered, but authors are asked to relegate, as far as possible, the details of analysis to an appendix. The scope of IET Generation, Transmission & Distribution includes the following: Design of transmission and distribution systems Operation and control of power generation Power system management, planning and economics Power system operation, protection and control Power system measurement and modelling Computer applications and computational intelligence in power flexible AC or DC transmission systems Special Issues. Current Call for papers: Next Generation of Synchrophasor-based Power System Monitoring, Operation and Control - https://digital-library.theiet.org/files/IET_GTD_CFP_NGSPSMOC.pdf
期刊最新文献
Power-DETR: end-to-end power line defect components detection based on contrastive denoising and hybrid label assignment Electric load forecasting under false data injection attacks via denoising deep learning and generative adversarial networks A data mining-based interruptible load contract model for the modern power system The implementation of a cost-efficient damped AC testing methodology for transmission cables based on DC–AC conversion and distributed partial discharge detection Dynamic in-motion wireless charging systems: Modelling and coordinated hierarchical operation in distribution systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1