Assessment of Geothermal Energy in Aluto-Langano and Tulu-Moye, Central Ethiopia

IF 1.4 4区 地球科学 Q3 GEOSCIENCES, MULTIDISCIPLINARY Geological Journal Pub Date : 2024-11-24 DOI:10.1002/gj.5073
Mamaru Genetu
{"title":"Assessment of Geothermal Energy in Aluto-Langano and Tulu-Moye, Central Ethiopia","authors":"Mamaru Genetu","doi":"10.1002/gj.5073","DOIUrl":null,"url":null,"abstract":"<div>\n \n <p>This study aims to identify the primary issues leading to the pause in geothermal energy development at Aluto-Langano and Tulu-Moye sites, while also exploring opportunities in new drilling wells and assessing compliance with occupational safety, health and environmental standards. The geothermal energy development status was evaluated through focus group discussions, site visits and field data collection. The Tulu-Moye Geothermal Operation (TMGO) project is underway to establish a power plant, with a phased development spanning 6 years targeting a total capacity of 150 MW, comprising 50 MW for Phase 1 and 100 MW for Phase 2, though with some constraints. The Aluto-I Geothermal Pilot Plant marked the initial efforts to produce electricity from geothermal sources but faced shutdown due to declining thermal energy in some wells, turbine corrosion, pentane leakage, frequent in efficiency of fans and instability of foundations. Consequently, Phase 2 of the project aims to integrate with Phase 1 wells to mitigate potential thermal energy losses. Geothermal energy development demands substantial initial investment but entails minimal ongoing costs and workforce requirements. Its eco-friendliness benefits communities, offering higher efficiency and lower maintenance compared to hydroelectricity. Leveraging Ethiopia's geothermal potential is crucial for electricity generation, mineral extraction, and water supply, with plans involving nationwide field expansion to enhance renewable energy capacity.</p>\n </div>","PeriodicalId":12784,"journal":{"name":"Geological Journal","volume":"60 1","pages":"64-72"},"PeriodicalIF":1.4000,"publicationDate":"2024-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geological Journal","FirstCategoryId":"89","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/gj.5073","RegionNum":4,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to identify the primary issues leading to the pause in geothermal energy development at Aluto-Langano and Tulu-Moye sites, while also exploring opportunities in new drilling wells and assessing compliance with occupational safety, health and environmental standards. The geothermal energy development status was evaluated through focus group discussions, site visits and field data collection. The Tulu-Moye Geothermal Operation (TMGO) project is underway to establish a power plant, with a phased development spanning 6 years targeting a total capacity of 150 MW, comprising 50 MW for Phase 1 and 100 MW for Phase 2, though with some constraints. The Aluto-I Geothermal Pilot Plant marked the initial efforts to produce electricity from geothermal sources but faced shutdown due to declining thermal energy in some wells, turbine corrosion, pentane leakage, frequent in efficiency of fans and instability of foundations. Consequently, Phase 2 of the project aims to integrate with Phase 1 wells to mitigate potential thermal energy losses. Geothermal energy development demands substantial initial investment but entails minimal ongoing costs and workforce requirements. Its eco-friendliness benefits communities, offering higher efficiency and lower maintenance compared to hydroelectricity. Leveraging Ethiopia's geothermal potential is crucial for electricity generation, mineral extraction, and water supply, with plans involving nationwide field expansion to enhance renewable energy capacity.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
求助全文
约1分钟内获得全文 去求助
来源期刊
Geological Journal
Geological Journal 地学-地球科学综合
CiteScore
4.20
自引率
11.10%
发文量
269
审稿时长
3 months
期刊介绍: In recent years there has been a growth of specialist journals within geological sciences. Nevertheless, there is an important role for a journal of an interdisciplinary kind. Traditionally, GEOLOGICAL JOURNAL has been such a journal and continues in its aim of promoting interest in all branches of the Geological Sciences, through publication of original research papers and review articles. The journal publishes Special Issues with a common theme or regional coverage e.g. Chinese Dinosaurs; Tectonics of the Eastern Mediterranean, Triassic basins of the Central and North Atlantic Borderlands). These are extensively cited. The Journal has a particular interest in publishing papers on regional case studies from any global locality which have conclusions of general interest. Such papers may emphasize aspects across the full spectrum of geological sciences.
期刊最新文献
Issue Information Issue Information Assessment of Geothermal Energy in Aluto-Langano and Tulu-Moye, Central Ethiopia Multi-Parameter Investigation of Cretaceous to Palaeocene Sedimentary Sequences in the Anambra and Niger Delta Basins, Nigeria: Organic Matter Characterisation, Palynofacies and Implications for Palaeoclimate and Sea-Level Changes New Euungulate Fossils from the Middle Siwalik Subgroup of the Potwar Plateau of Northern Pakistan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1