Emerson's framework on the output of public-private partnership on hemodialysis services in Indonesia regional hospitals

Q1 Social Sciences Global Transitions Pub Date : 2025-01-01 DOI:10.1016/j.glt.2025.01.001
Masyitoh Basabih , Eko Prasojo , Amy Yayuk Sri Rahayu
{"title":"Emerson's framework on the output of public-private partnership on hemodialysis services in Indonesia regional hospitals","authors":"Masyitoh Basabih ,&nbsp;Eko Prasojo ,&nbsp;Amy Yayuk Sri Rahayu","doi":"10.1016/j.glt.2025.01.001","DOIUrl":null,"url":null,"abstract":"<div><h3>Context</h3><div>Public-private partnerships (PPPs) have become the dominant solution adopted by regional hospitals in Indonesia for providing hemodialysis equipment. Analyzing the implementation of PPPs requires using a collaborative governance framework to provide a comprehensive analysis and depict the relationships between variables. This study aims to determine the influence of system context, drivers, and collaborative processes on the outcomes of PPP hemodialysis services in regional hospital in Indonesia.</div></div><div><h3>Methods</h3><div>This study employs a quantitative approach with primary data obtained through a survey. The research sample consists of 75 regional hospitals represented by 111 respondents. Analysis was conducted using the Partial Least Square-Structural Equation Modeling (PLS-SEM) technique.</div></div><div><h3>Findings</h3><div>The system context indirectly influences the process through mediation by the driver variable at 0.451, where the driver significantly affects the collaborative process at 0.534, and the collaborative process significantly influences the outcome at 0.773. The policy dimension makes the largest contribution to the systemic context, as does the consequential incentive dimension to the drivers. In the process variable, the capacity for joint action is the dimension with the greatest contribution.</div></div><div><h3>Conclusions</h3><div>The outcomes of implementing PPP in hemodialysis services at regional hospital are influenced by system context, drivers, and collaborative processes both directly and indirectly. Policy barriers, human resources, and corrupt practices also affect the process and outcomes of hemodialysis PPP, which are perceived not to be in line with good governance.</div></div>","PeriodicalId":33615,"journal":{"name":"Global Transitions","volume":"7 ","pages":"Pages 56-68"},"PeriodicalIF":0.0000,"publicationDate":"2025-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Transitions","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2589791825000015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Context

Public-private partnerships (PPPs) have become the dominant solution adopted by regional hospitals in Indonesia for providing hemodialysis equipment. Analyzing the implementation of PPPs requires using a collaborative governance framework to provide a comprehensive analysis and depict the relationships between variables. This study aims to determine the influence of system context, drivers, and collaborative processes on the outcomes of PPP hemodialysis services in regional hospital in Indonesia.

Methods

This study employs a quantitative approach with primary data obtained through a survey. The research sample consists of 75 regional hospitals represented by 111 respondents. Analysis was conducted using the Partial Least Square-Structural Equation Modeling (PLS-SEM) technique.

Findings

The system context indirectly influences the process through mediation by the driver variable at 0.451, where the driver significantly affects the collaborative process at 0.534, and the collaborative process significantly influences the outcome at 0.773. The policy dimension makes the largest contribution to the systemic context, as does the consequential incentive dimension to the drivers. In the process variable, the capacity for joint action is the dimension with the greatest contribution.

Conclusions

The outcomes of implementing PPP in hemodialysis services at regional hospital are influenced by system context, drivers, and collaborative processes both directly and indirectly. Policy barriers, human resources, and corrupt practices also affect the process and outcomes of hemodialysis PPP, which are perceived not to be in line with good governance.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
求助全文
约1分钟内获得全文 去求助
来源期刊
Global Transitions
Global Transitions Social Sciences-Development
CiteScore
18.90
自引率
0.00%
发文量
1
审稿时长
20 weeks
期刊最新文献
Environmental science, policy, and industry nexus: Integrating Frameworks for better transport sustainability SARS-CoV-2 infection dynamics in household case-contact study: Biological sample analysis from India The role of carbon peaking targets in urban green economic transition: Insights from U.S. city-level climate action plans Emerson's framework on the output of public-private partnership on hemodialysis services in Indonesia regional hospitals Exploring the impact of globalization and economic-energy dynamics on environmental sustainability in the EU
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1