Real-World Patient-Reported Outcome Measure Implementation: Challenges and Successes of a Pan-Canadian Initiative to Improve the Future of Patient-Centered Cancer Care.
Sylvie Lambert, Michael McKenzie, Andrea C Coronado, Amanda Caissie, Linda Tracey, Linda Watson, Andrea Deiure, Raquel Shaw-Moxam, Jean Ann Ryan, Marianne Arab, Bryan Jorgensen, Ashley Crump, Lisa Rayner, Mireille Lecours, Peter Shaw Howatt
{"title":"Real-World Patient-Reported Outcome Measure Implementation: Challenges and Successes of a Pan-Canadian Initiative to Improve the Future of Patient-Centered Cancer Care.","authors":"Sylvie Lambert, Michael McKenzie, Andrea C Coronado, Amanda Caissie, Linda Tracey, Linda Watson, Andrea Deiure, Raquel Shaw-Moxam, Jean Ann Ryan, Marianne Arab, Bryan Jorgensen, Ashley Crump, Lisa Rayner, Mireille Lecours, Peter Shaw Howatt","doi":"10.1200/OP-24-00551","DOIUrl":null,"url":null,"abstract":"<p><strong>Purpose: </strong>Implementation of patient-reported outcome measures (PROMs) in routine care continues to be limited, despite their demonstrated efficacy and substantial investments. We report on the lessons learned and the challenges of the concerted implementation of the same PROMs across teams in nine provinces/territories (jurisdictions) in Canada, as well as the solutions to move implementation forward despite cost containments and the COVID-19 pandemic.</p><p><strong>Methods: </strong>Each team from nine jurisdictions submitted a final report describing their PROM implementation project. Reports were analyzed for themes on lessons learned, challenges, and solutions. Themes were compared for similarities and differences. The Standards for Quality Improvement Reporting Excellence (SQUIRE) guidelines were used.</p><p><strong>Results: </strong>Six key lessons learned were identified from eight challenges. To address these challenges, 27 solutions were used. The six lessons learned were as follows: Harness the power of change management, ensure consistent stakeholder engagement at all levels for success, establish buy-in as soon as possible, plan to maintain buy-in through changing circumstances, identify ways to make technology the solution, and optimal implementation includes a sustainability plan. Examples of solutions included the following: develop a multipronged, multilevel communication plan; include change management experts on the team; identify champions; restructure and reprioritize as needed; leverage existing technology; and leave a permanent trace of the project.</p><p><strong>Conclusion: </strong>To our knowledge, this is the first analysis to synthesize lessons learned from real-world PROM implementation across geographically diverse jurisdictions. We identified generalizable solutions that other health care managers and policymakers can use to accelerate PROM implementation, despite pervasive implementation barriers. Future studies can integrate these solutions with methods and tools from implementation science (eg, theoretical frameworks, implementation strategies) for more successful spread and scale of PROMs.</p>","PeriodicalId":14612,"journal":{"name":"JCO oncology practice","volume":" ","pages":"OP2400551"},"PeriodicalIF":4.7000,"publicationDate":"2025-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JCO oncology practice","FirstCategoryId":"3","ListUrlMain":"https://doi.org/10.1200/OP-24-00551","RegionNum":3,"RegionCategory":"医学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ONCOLOGY","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose: Implementation of patient-reported outcome measures (PROMs) in routine care continues to be limited, despite their demonstrated efficacy and substantial investments. We report on the lessons learned and the challenges of the concerted implementation of the same PROMs across teams in nine provinces/territories (jurisdictions) in Canada, as well as the solutions to move implementation forward despite cost containments and the COVID-19 pandemic.
Methods: Each team from nine jurisdictions submitted a final report describing their PROM implementation project. Reports were analyzed for themes on lessons learned, challenges, and solutions. Themes were compared for similarities and differences. The Standards for Quality Improvement Reporting Excellence (SQUIRE) guidelines were used.
Results: Six key lessons learned were identified from eight challenges. To address these challenges, 27 solutions were used. The six lessons learned were as follows: Harness the power of change management, ensure consistent stakeholder engagement at all levels for success, establish buy-in as soon as possible, plan to maintain buy-in through changing circumstances, identify ways to make technology the solution, and optimal implementation includes a sustainability plan. Examples of solutions included the following: develop a multipronged, multilevel communication plan; include change management experts on the team; identify champions; restructure and reprioritize as needed; leverage existing technology; and leave a permanent trace of the project.
Conclusion: To our knowledge, this is the first analysis to synthesize lessons learned from real-world PROM implementation across geographically diverse jurisdictions. We identified generalizable solutions that other health care managers and policymakers can use to accelerate PROM implementation, despite pervasive implementation barriers. Future studies can integrate these solutions with methods and tools from implementation science (eg, theoretical frameworks, implementation strategies) for more successful spread and scale of PROMs.