Flexible Ramping Product Procurement in Day-Ahead Markets

Ogün Yurdakul;Erik Ela;Farhad Billimoria
{"title":"Flexible Ramping Product Procurement in Day-Ahead Markets","authors":"Ogün Yurdakul;Erik Ela;Farhad Billimoria","doi":"10.1109/TEMPR.2024.3453907","DOIUrl":null,"url":null,"abstract":"Flexible ramping products (FRPs) emerge as a promising instrument for addressing steep and uncertain ramping needs through market mechanisms. Initial implementations of FRPs in North American electricity markets, however, revealed several shortcomings in existing FRP designs. In many instances, FRP prices failed to signal the true value of ramping capacity, most notably evident in zero FRP prices observed in a myriad of periods during which the system was in acute need for rampable capacity. These periods were marked by scheduled but undeliverable FRPs, often calling for operator out-of-market actions. On top of that, the methods used for procuring FRPs have been primarily rule-based, lacking explicit economic underpinnings. In this paper, we put forth an alternative framework for FRP procurement, which seeks to set FRP requirements and schedule FRP awards such that the expected system operation cost is minimized. Using real-world data from U.S. ISOs, we showcase the relative merits of the framework in (i) reducing the total system operation cost, (ii) improving price formation, (iii) enhancing the the deliverability of FRP awards, and (iv) reducing the need for out-of-market actions.","PeriodicalId":100639,"journal":{"name":"IEEE Transactions on Energy Markets, Policy and Regulation","volume":"3 1","pages":"13-31"},"PeriodicalIF":3.7000,"publicationDate":"2024-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Energy Markets, Policy and Regulation","FirstCategoryId":"1085","ListUrlMain":"https://ieeexplore.ieee.org/document/10663851/","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Flexible ramping products (FRPs) emerge as a promising instrument for addressing steep and uncertain ramping needs through market mechanisms. Initial implementations of FRPs in North American electricity markets, however, revealed several shortcomings in existing FRP designs. In many instances, FRP prices failed to signal the true value of ramping capacity, most notably evident in zero FRP prices observed in a myriad of periods during which the system was in acute need for rampable capacity. These periods were marked by scheduled but undeliverable FRPs, often calling for operator out-of-market actions. On top of that, the methods used for procuring FRPs have been primarily rule-based, lacking explicit economic underpinnings. In this paper, we put forth an alternative framework for FRP procurement, which seeks to set FRP requirements and schedule FRP awards such that the expected system operation cost is minimized. Using real-world data from U.S. ISOs, we showcase the relative merits of the framework in (i) reducing the total system operation cost, (ii) improving price formation, (iii) enhancing the the deliverability of FRP awards, and (iv) reducing the need for out-of-market actions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
日前市场中的灵活斜坡产品采购
灵活的斜坡产品(frp)是通过市场机制解决陡峭和不确定的斜坡需求的一种有前途的工具。然而,FRP在北美电力市场的初步实施暴露了现有FRP设计的几个缺点。在许多情况下,玻璃钢价格未能反映产能增加的真实价值,最明显的是,在系统迫切需要产能增加的无数个时期,玻璃钢价格为零。这段时间的特点是计划好的但无法交付的frp,通常要求运营商采取市场外行动。最重要的是,用于采购frp的方法主要基于规则,缺乏明确的经济基础。在本文中,我们提出了玻璃钢采购的替代框架,该框架旨在设定玻璃钢要求并安排玻璃钢奖励,从而使预期的系统运行成本最小化。使用来自美国iso的真实数据,我们展示了该框架在以下方面的相对优点:(i)降低系统总运营成本,(ii)改善价格形成,(iii)提高FRP奖励的可交付性,以及(iv)减少对市场外行动的需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Table of Contents Consumer-Based Carbon Costs: Integrating Consumer Carbon Preferences in Electricity Markets Equity-Aware Peer-to-Peer Energy Trading Market to Mitigate Energy Poverty: An LLM – RL Agentic Workflow Safe Reinforcement Learning for Battery Energy Storage Participation in the Imbalance Settlement Umbrella Uncertainty Set Identification to Enhance Reserve Deliverability
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1