{"title":"Transition to a unit-based quality assurance approach: a description of one successful implementation strategy.","authors":"M Thomter","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>In 1987 the decision was taken by the Nursing Executive at Princess Margaret Hospital for Children to substitute the centralized approach to quality assurance (QA) with a unit-based system. The strategies used to ensure the successful implementation of the new system are discussed--together with the pitfalls encountered during the transition phase.</p>","PeriodicalId":77019,"journal":{"name":"Australian clinical review","volume":"13 3","pages":"111-7"},"PeriodicalIF":0.0000,"publicationDate":"1993-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australian clinical review","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In 1987 the decision was taken by the Nursing Executive at Princess Margaret Hospital for Children to substitute the centralized approach to quality assurance (QA) with a unit-based system. The strategies used to ensure the successful implementation of the new system are discussed--together with the pitfalls encountered during the transition phase.