{"title":"Energy management installation at North Middlesex Hospital.","authors":"V A Hart","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>The author is the Energy Conservation Officer for the Haringey Health Authority. The North Middlesex Hospital is an acute unit with approximately 700 beds. Currently, twenty-one outstations control the maternity/radio therapy tower complex plus the outpatients' department. Plans have been approved to extend the system and Phase 2 will cover pathology, administration, medical and surgical blocks together with x-ray and casualty blocks. Transmitton Ltd, as in Phase 1, will supply the hardware and contract management.</p>","PeriodicalId":79975,"journal":{"name":"Hospital engineering","volume":"40 5","pages":"4-5"},"PeriodicalIF":0.0000,"publicationDate":"1986-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hospital engineering","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The author is the Energy Conservation Officer for the Haringey Health Authority. The North Middlesex Hospital is an acute unit with approximately 700 beds. Currently, twenty-one outstations control the maternity/radio therapy tower complex plus the outpatients' department. Plans have been approved to extend the system and Phase 2 will cover pathology, administration, medical and surgical blocks together with x-ray and casualty blocks. Transmitton Ltd, as in Phase 1, will supply the hardware and contract management.