The design and construction management process.

The Psychiatric hospital Pub Date : 1987-01-01
T M Ebejer
{"title":"The design and construction management process.","authors":"T M Ebejer","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>The design and construction process is important for any hospital group. The process consists of many steps and contributing factors such as accurate estimating, realistic completion schedules, and comprehensive construction data. It is the responsibility of the Design and Construction Team to insure that these items are met. In the design and construction of a project, time is of the essence. The timely completion can add to the earnings of a hospital group. Conversely, the delayed completion of a project will cause the hospital group to lose tens of thousands, if not hundreds of thousands of dollars. Therefore, it is imperative that the hospital group establishes a Design and Construction Team that will promote the interest of the owner through contract cost containment and efficient project scheduling.</p>","PeriodicalId":79749,"journal":{"name":"The Psychiatric hospital","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1987-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Psychiatric hospital","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The design and construction process is important for any hospital group. The process consists of many steps and contributing factors such as accurate estimating, realistic completion schedules, and comprehensive construction data. It is the responsibility of the Design and Construction Team to insure that these items are met. In the design and construction of a project, time is of the essence. The timely completion can add to the earnings of a hospital group. Conversely, the delayed completion of a project will cause the hospital group to lose tens of thousands, if not hundreds of thousands of dollars. Therefore, it is imperative that the hospital group establishes a Design and Construction Team that will promote the interest of the owner through contract cost containment and efficient project scheduling.

分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
设计施工管理流程。
设计和施工过程对任何医院集团都很重要。该过程包括许多步骤和因素,如准确的估算、现实的完工时间表和全面的施工数据。设计和施工团队有责任确保满足这些要求。在一个项目的设计和施工中,时间是至关重要的。及时完成可以增加医院集团的收益。相反,一个项目的延迟完成将使医院集团损失数万美元,甚至数十万美元。因此,医院集团必须建立一个设计和施工团队,通过合同成本控制和高效的项目调度来促进业主的利益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Strategic implications of healthcare reform for mental health providers. Comorbidity in an inpatient eating disordered population: clinical characteristics and treatment implications. Dramatic changes in care: the experience of one psychiatric hospital. Treatment outcome and continuous quality improvement: two aspects of program evaluation. The sibling group: beginning to meet the needs of child siblings of psychiatrically hospitalized children.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1