The makeover of the Lakeshore General Hospital laboratories.

Teresa Estioko-Taimuri
{"title":"The makeover of the Lakeshore General Hospital laboratories.","authors":"Teresa Estioko-Taimuri","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>This article describes the expansion and reorganization of a moderate-sized Canadian laboratory from Day One to \"Live Day.\" The key factors to the success of this project were organized planning by the laboratory staff and the introduction of core lab theories, team building, and organized training sessions. The successful makeover resulted in improved turnaround time for STAT tests, especially those coming from the Emergency Unit. The efforts of the laboratory personnel toward the improvement of laboratory services, in spite of budget, human resources constraints, and resistance to change, are addressed.</p>","PeriodicalId":80950,"journal":{"name":"Clinical leadership & management review : the journal of CLMA","volume":"20 1","pages":"E5"},"PeriodicalIF":0.0000,"publicationDate":"2006-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Clinical leadership & management review : the journal of CLMA","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This article describes the expansion and reorganization of a moderate-sized Canadian laboratory from Day One to "Live Day." The key factors to the success of this project were organized planning by the laboratory staff and the introduction of core lab theories, team building, and organized training sessions. The successful makeover resulted in improved turnaround time for STAT tests, especially those coming from the Emergency Unit. The efforts of the laboratory personnel toward the improvement of laboratory services, in spite of budget, human resources constraints, and resistance to change, are addressed.

分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
湖岸综合医院实验室的改造。
本文描述了一个中等规模的加拿大实验室从Day One到“Live Day”的扩展和重组。实验室人员的组织规划和实验室核心理论的介绍、团队建设、组织培训是项目成功的关键因素。成功的改头换面缩短了STAT测试的周转时间,特别是那些来自急诊科的测试。尽管存在预算、人力资源限制和变革阻力,但实验室人员仍在努力改善实验室服务。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
National medical laboratory professionals week: celebrate our time. Blood management: a model of excellence. Guidelines for implementing automation in a hospital laboratory setting--part II. Strategies for improving employee retention. The acquisition of laboratory equipment.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1