Placing and preserving priorities: projects, productivity, progress and people.

J Babiak
{"title":"Placing and preserving priorities: projects, productivity, progress and people.","authors":"J Babiak","doi":"10.1155/S1463924698000170","DOIUrl":null,"url":null,"abstract":"<p><p>High throughput screening (HTS) involves using automated equipment to test a large number of samples against a defined molecular target to identify a reasonable number of active molecules in a timely fashion. Major factors which can influence priorities for the limited resources of the HTS group are projects, productivity, progress and people. The challenge to the HTS group is to provide excellent and timely screening services, but still devote efforts to new technologies and personnel development. This article explains why these factors are so important.</p>","PeriodicalId":22600,"journal":{"name":"The Journal of Automatic Chemistry","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1998-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1155/S1463924698000170","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Automatic Chemistry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1155/S1463924698000170","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

High throughput screening (HTS) involves using automated equipment to test a large number of samples against a defined molecular target to identify a reasonable number of active molecules in a timely fashion. Major factors which can influence priorities for the limited resources of the HTS group are projects, productivity, progress and people. The challenge to the HTS group is to provide excellent and timely screening services, but still devote efforts to new technologies and personnel development. This article explains why these factors are so important.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
确定和保留优先级:项目、生产力、进度和人员。
高通量筛选(HTS)涉及使用自动化设备对大量样品进行确定的分子靶标测试,以及时识别合理数量的活性分子。影响HTS小组有限资源优先级的主要因素是项目、生产力、进度和人员。HTS集团面临的挑战是提供优质及时的筛查服务,但仍致力于新技术和人才发展。这篇文章解释了为什么这些因素如此重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
product news From the editor's desk Product news Product News Meeting Reports
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1