Flood plans in England

Q4 Earth and Planetary Sciences Dams and Reservoirs Pub Date : 2022-03-01 DOI:10.1680/jdare.2022.32.1.2
Alan Brown, A. Courtnadge, J. Gosden
{"title":"Flood plans in England","authors":"Alan Brown, A. Courtnadge, J. Gosden","doi":"10.1680/jdare.2022.32.1.2","DOIUrl":null,"url":null,"abstract":"This paper describes key issues relating to the Ministerial Direction to prepare flood plans, issued in April 2021, and how and why the interpretation of the authors differs from that of the Environment Agency Reservoir Safety Team.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.2022.32.1.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

This paper describes key issues relating to the Ministerial Direction to prepare flood plans, issued in April 2021, and how and why the interpretation of the authors differs from that of the Environment Agency Reservoir Safety Team.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
英国的防洪计划
本文描述了与2021年4月发布的准备洪水计划的部长指示有关的关键问题,以及作者的解释如何以及为什么与环境署水库安全小组的解释不同。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
期刊最新文献
Leeds FAS2 FSR: environmental challenges for the design of an in-river control structure Simulating a reservoir on-site flood plan test: Operation Redbrook Dunside reservoirs discontinuance – taking a new approach Undertaking RARS assessments for Hong Kong reservoirs Assessment the stability of earth dams based on construction pace by fuzzy inference logic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1