Challenges negating virtual construction project team performance in the Middle East

IF 1.9 Q3 ENGINEERING, CIVIL Built Environment Project and Asset Management Pub Date : 2022-01-25 DOI:10.1108/bepam-08-2021-0104
Sukhwant Kaur Sagar, M. Arif, O. Oladinrin, Muhammed Qasim Rana
{"title":"Challenges negating virtual construction project team performance in the Middle East","authors":"Sukhwant Kaur Sagar, M. Arif, O. Oladinrin, Muhammed Qasim Rana","doi":"10.1108/bepam-08-2021-0104","DOIUrl":null,"url":null,"abstract":"PurposeOver the last couple of decades, many organisations are increasingly adopting virtual team concepts, and construction companies in the Middle East are no exception. Members of a virtual team are geographically scattered and represent a diverse range of cultures. Thus, challenging issues emerge more frequently than in a traditional team. There are challenges associated with space and time as well as high client's demand. Therefore, this study aims to identify and probe the causes of the challenges in virtual project teams in the construction industry of the Middle East.Design/methodology/approachA list of challenges was derived through a comprehensive review of relevant literature. Questionnaire survey was conducted with professionals who are involved in construction virtual project teams. Further, the factor analysis technique was used to analyse the survey responses.FindingsThe results show that the challenges in virtual team arrangement in the Middle East construction industry can be grouped into seven categories, namely, organisational culture, conflict within the team, characteristics of the team members, trust within the team members diversity of the team, communication and training, and cohesion in the team. Understanding of these factors will drive the needed platform to support effective virtual project teams in the Middle East.Originality/valueThis study raises the prospect that organisations may establish an environment for team members to achieve higher levels of virtual cooperation by concentrating on these potentially crucial factors. This, in turn, will encourage further innovation and performance within construction organisations.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2022-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-08-2021-0104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 4

Abstract

PurposeOver the last couple of decades, many organisations are increasingly adopting virtual team concepts, and construction companies in the Middle East are no exception. Members of a virtual team are geographically scattered and represent a diverse range of cultures. Thus, challenging issues emerge more frequently than in a traditional team. There are challenges associated with space and time as well as high client's demand. Therefore, this study aims to identify and probe the causes of the challenges in virtual project teams in the construction industry of the Middle East.Design/methodology/approachA list of challenges was derived through a comprehensive review of relevant literature. Questionnaire survey was conducted with professionals who are involved in construction virtual project teams. Further, the factor analysis technique was used to analyse the survey responses.FindingsThe results show that the challenges in virtual team arrangement in the Middle East construction industry can be grouped into seven categories, namely, organisational culture, conflict within the team, characteristics of the team members, trust within the team members diversity of the team, communication and training, and cohesion in the team. Understanding of these factors will drive the needed platform to support effective virtual project teams in the Middle East.Originality/valueThis study raises the prospect that organisations may establish an environment for team members to achieve higher levels of virtual cooperation by concentrating on these potentially crucial factors. This, in turn, will encourage further innovation and performance within construction organisations.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
挑战否定虚拟建设项目团队在中东的表现
在过去的几十年里,许多组织越来越多地采用虚拟团队的概念,中东的建筑公司也不例外。虚拟团队的成员在地理上是分散的,代表着不同的文化。因此,具有挑战性的问题比在传统团队中更频繁地出现。空间和时间的挑战以及客户的高需求。因此,本研究旨在识别和探讨中东建筑业虚拟项目团队面临挑战的原因。设计/方法/方法通过对相关文献的全面回顾,得出了一系列挑战。对参与建设虚拟项目团队的专业人员进行问卷调查。进一步,运用因子分析技术对调查结果进行分析。研究结果表明,中东建筑行业虚拟团队组织面临的挑战可分为组织文化、团队内部冲突、团队成员特征、团队内部信任、团队成员多样性、沟通与培训、团队凝聚力等7个方面。了解这些因素将推动所需的平台来支持中东地区有效的虚拟项目团队。原创性/价值本研究提出了这样一种前景:组织可以通过关注这些潜在的关键因素,为团队成员建立一个实现更高水平虚拟合作的环境。这反过来又会鼓励建筑组织进一步创新和提高绩效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.30
自引率
9.10%
发文量
41
期刊最新文献
Application of lean principles for building refurbishment projects in Sri Lanka Unraveling consumer behavioral intentions to adopt solar water heaters in India using UTAUT model Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects Benefits and challenges of implementing green building development in Nigeria Developing a framework for building information modelling (BIM) adoption in New Zealand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1