Use and Influence of Tire Rubber Waste Powder in Bitumen Product

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2020-10-20 DOI:10.2478/jeppm-2021-0009
Leopold Mbereyaho, Lewis Manzi, Prince Kamanzi, B. Nizeyimana
{"title":"Use and Influence of Tire Rubber Waste Powder in Bitumen Product","authors":"Leopold Mbereyaho, Lewis Manzi, Prince Kamanzi, B. Nizeyimana","doi":"10.2478/jeppm-2021-0009","DOIUrl":null,"url":null,"abstract":"Abstract The waste generation from old rubber tires has been increasing and causing environmental degradation with the escalation of vehicles number especially in the cities. Bitumen is extensively used in flexible pavement construction and as its manufacturing industries were still growing, the cost has not been much affordable. This study aimed at evaluating the possibility of a partial replacement of ordinary bitumen by tire rubber waste, with the purpose to reduce not only the amount of rubber wastes dispersed in the nature, but also the material cost, while keeping or improving the bitumen product performance. The study used rubber waste powder as partial replacement to ordinary bitumen by 5%, 10%, 15%, and 20% of its weight and, with adequate samples, properties of the bitumen product were investigated, after checking the standard quality of used bitumen 60/70 grade. It was established that more adequate results were achieved at 5% of replacement, which showed the penetration value of 61.66 tenths mm, the softening point value of 52.750C, and the viscosity of 134 sec. Regarding the cost estimation of this new bitumen, a cost reduction of around 5.3% was realized. Therefore, the use of rubber waste powder would contribute not only to the reduction of the quantity of respective waste in the environment, but also influence on the material affordability. The use of other grades of bitumen than 60/70, as well as the strength and durability performance may be a good scope for further studies.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"82 - 88"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2021-0009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 3

Abstract

Abstract The waste generation from old rubber tires has been increasing and causing environmental degradation with the escalation of vehicles number especially in the cities. Bitumen is extensively used in flexible pavement construction and as its manufacturing industries were still growing, the cost has not been much affordable. This study aimed at evaluating the possibility of a partial replacement of ordinary bitumen by tire rubber waste, with the purpose to reduce not only the amount of rubber wastes dispersed in the nature, but also the material cost, while keeping or improving the bitumen product performance. The study used rubber waste powder as partial replacement to ordinary bitumen by 5%, 10%, 15%, and 20% of its weight and, with adequate samples, properties of the bitumen product were investigated, after checking the standard quality of used bitumen 60/70 grade. It was established that more adequate results were achieved at 5% of replacement, which showed the penetration value of 61.66 tenths mm, the softening point value of 52.750C, and the viscosity of 134 sec. Regarding the cost estimation of this new bitumen, a cost reduction of around 5.3% was realized. Therefore, the use of rubber waste powder would contribute not only to the reduction of the quantity of respective waste in the environment, but also influence on the material affordability. The use of other grades of bitumen than 60/70, as well as the strength and durability performance may be a good scope for further studies.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
轮胎废胶粉在沥青产品中的应用及影响
摘要随着车辆数量的增加,尤其是在城市,旧橡胶轮胎产生的废物越来越多,并导致环境恶化。沥青被广泛用于柔性路面施工,由于其制造业仍在增长,其成本一直难以承受。本研究旨在评估用轮胎橡胶废料部分替代普通沥青的可能性,目的是在保持或改善沥青产品性能的同时,不仅减少橡胶废料在自然界中的分散量,还降低材料成本。该研究使用废橡胶粉末作为普通沥青的部分替代品,其重量分别为普通沥青的5%、10%、15%和20%,并在检查了60/70级使用沥青的标准质量后,使用足够的样品对沥青产品的性能进行了调查。据证实,在5%的更换量下获得了更充分的结果,其穿透值为61.66十分之一毫米,软化点值为52.750C,粘度为134秒。关于这种新沥青的成本估算,实现了约5.3%的成本降低。因此,橡胶废粉末的使用不仅有助于减少环境中相应废物的数量,而且会影响材料的可负担性。使用60/70以外的其他等级的沥青,以及强度和耐久性性能,可能是进一步研究的良好范围。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1