Public–Private Partnerships: A Fresh Risk-Based Approach to Water Sector Projects

IF 2.7 Q2 CONSTRUCTION & BUILDING TECHNOLOGY Infrastructures Pub Date : 2023-06-02 DOI:10.3390/infrastructures8060102
S. Lima, A. Brochado, R. Marques
{"title":"Public–Private Partnerships: A Fresh Risk-Based Approach to Water Sector Projects","authors":"S. Lima, A. Brochado, R. Marques","doi":"10.3390/infrastructures8060102","DOIUrl":null,"url":null,"abstract":"This study focused on the unbalanced relationships that can arise in current public–private partnership (PPP) risk management frameworks, especially in developing countries’ water sectors. Different stakeholders’ perceptions of risk management were examined by analyzing 15 interviews in Portugal and Mozambique. The hybrid method included semantic, descriptive statistic, content, and narrative analyses. To achieve the research objectives, the semi-structured interview transcripts were processed using quantitative and qualitative techniques to collate relevant actors’ opinions of risk management in PPP water projects. Five risk categories were identified. The interviewed experts ranked the financial risk category as the most crucial, followed by infrastructure, commercial, technical and operational, and context risks. However, when the transcripts were evaluated from a risk factor perspective, the context risk category unexpectedly jumped to first place. Twenty-five high-impact risk factors were isolated in the semi-structured interview contents. The top five most critical risk factors were political interference, no performance measurement baselines, an unfavorable private investment climate, nonpayment of bills, and water assets uncertain condition. The results comprise a fresh contribution to the existing knowledge about experts’ perceptions of PPP contract risks, including that prior research and specialists categorize financial risks as the most important. The findings further reveal that experts consider managing context risks to be the key factor in PPPs success in developing countries, as well as highlighting the need to explore these risks more fully in emerging economies’ water sectors. In addition, a complete risk management cycle is proposed based on the interviewed professionals’ opinions, in which risk assessment and risk treatment or mitigation measures are dealt with simultaneously.","PeriodicalId":13601,"journal":{"name":"Infrastructures","volume":" ","pages":""},"PeriodicalIF":2.7000,"publicationDate":"2023-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/infrastructures8060102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

This study focused on the unbalanced relationships that can arise in current public–private partnership (PPP) risk management frameworks, especially in developing countries’ water sectors. Different stakeholders’ perceptions of risk management were examined by analyzing 15 interviews in Portugal and Mozambique. The hybrid method included semantic, descriptive statistic, content, and narrative analyses. To achieve the research objectives, the semi-structured interview transcripts were processed using quantitative and qualitative techniques to collate relevant actors’ opinions of risk management in PPP water projects. Five risk categories were identified. The interviewed experts ranked the financial risk category as the most crucial, followed by infrastructure, commercial, technical and operational, and context risks. However, when the transcripts were evaluated from a risk factor perspective, the context risk category unexpectedly jumped to first place. Twenty-five high-impact risk factors were isolated in the semi-structured interview contents. The top five most critical risk factors were political interference, no performance measurement baselines, an unfavorable private investment climate, nonpayment of bills, and water assets uncertain condition. The results comprise a fresh contribution to the existing knowledge about experts’ perceptions of PPP contract risks, including that prior research and specialists categorize financial risks as the most important. The findings further reveal that experts consider managing context risks to be the key factor in PPPs success in developing countries, as well as highlighting the need to explore these risks more fully in emerging economies’ water sectors. In addition, a complete risk management cycle is proposed based on the interviewed professionals’ opinions, in which risk assessment and risk treatment or mitigation measures are dealt with simultaneously.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
公私合作:水务部门项目新的基于风险的方法
本研究的重点是当前公私伙伴关系(PPP)风险管理框架中可能出现的不平衡关系,特别是在发展中国家的水务部门。通过分析葡萄牙和莫桑比克的15个访谈,研究了不同利益相关者对风险管理的看法。混合方法包括语义分析、描述性统计分析、内容分析和叙事分析。为了达到研究目的,采用定量和定性技术对半结构化访谈记录进行处理,整理相关行为主体对PPP水务项目风险管理的看法。确定了五种风险类别。受访专家将金融风险类别列为最关键的,其次是基础设施、商业、技术和运营以及环境风险。然而,当从风险因素的角度评估转录本时,上下文风险类别出乎意料地跃升至首位。在半结构化访谈内容中分离出25个高影响风险因素。五大最关键的风险因素是政治干预、没有绩效衡量基准、不利的私人投资环境、拖欠账单和水资产不确定状况。研究结果对现有专家对PPP合同风险的看法做出了新的贡献,包括先前的研究和专家将财务风险分类为最重要的风险。研究结果进一步表明,专家们认为管理环境风险是ppp在发展中国家取得成功的关键因素,同时也强调了在新兴经济体的水资源部门更充分地探索这些风险的必要性。此外,根据受访专业人员的意见,提出了一个完整的风险管理周期,其中风险评估和风险处理或缓解措施同时进行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Infrastructures
Infrastructures Engineering-Building and Construction
CiteScore
5.20
自引率
7.70%
发文量
145
审稿时长
11 weeks
期刊最新文献
Exploring the Cyclic Behaviour of URM Walls with and without Damp-Proof Course (DPC) Membranes through Discrete Element Method Modeling Variability in Seismic Analysis of Concrete Gravity Dams: A Parametric Analysis of Koyna and Pine Flat Dams Smartphone-Based Cost-Effective Pavement Performance Model Development Using a Machine Learning Technique with Limited Data State of the Art Review of Ageing of Bituminous Binders and Asphalt Mixtures: Ageing Simulation Techniques, Ageing Inhibitors and the Relationship between Simulated Ageing and Field Ageing On the Generation of Digital Data and Models from Point Clouds: Application to a Pedestrian Bridge Structure
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1