N. Mustaffa, Roselan Nayan, Farah Azwanee Aminuddin, Siti Suhana Judi
{"title":"Issues Encountered in the Valuation of Interim Payment Process in Construction Projects","authors":"N. Mustaffa, Roselan Nayan, Farah Azwanee Aminuddin, Siti Suhana Judi","doi":"10.1061/(asce)la.1943-4170.0000596","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":1.6000,"publicationDate":"2023-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/(asce)la.1943-4170.0000596","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"LAW","Score":null,"Total":0}