SELECTING HIGH PRIORITY ACTIVITIES FOR THE REALLOCATION OF RESOURCES TO REDUCE CONSTRUCTION DURATION

IF 4.3 3区 工程技术 Q1 ENGINEERING, CIVIL Journal of Civil Engineering and Management Pub Date : 2022-09-07 DOI:10.3846/jcem.2022.17204
Chijoo Lee
{"title":"SELECTING HIGH PRIORITY ACTIVITIES FOR THE REALLOCATION OF RESOURCES TO REDUCE CONSTRUCTION DURATION","authors":"Chijoo Lee","doi":"10.3846/jcem.2022.17204","DOIUrl":null,"url":null,"abstract":"It is difficult to identify economically feasible alternatives to reduce the duration of construction, as many important factors are present in any given construction project, such as increased construction costs and incentives and decreased delay liquidated damages. Most importantly, thousands of activities are interconnected in a complicated manner. This study proposes a method for analyzing the priority of activities for the reallocation of resources in order to reduce construction delay duration. The proposed method is composed of two steps: the prioritization of activities that can reduce construction duration and a reallocation of resources based upon that prioritization. First, in order to analyze priority, combinations of the lowest-cost activities for reducing per day are derived. Then, the importance of influence factors is analyzed, using the fuzzy analytic hierarchy process and fuzzy inference, and priority is derived based on the importance level. Next, the resources are reallocated based on the objective functions of maximizing the importance of the selected activities, reducing the duration, and minimizing the reducing cost. Decision-makers can compare between the reduction duration and available cost, and compare between results of the proposed method and the existing cost-slope method. Then, decision-makers can use the proposed method differently based on their own preferences toward economic and qualitative importance.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3000,"publicationDate":"2022-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.3846/jcem.2022.17204","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

It is difficult to identify economically feasible alternatives to reduce the duration of construction, as many important factors are present in any given construction project, such as increased construction costs and incentives and decreased delay liquidated damages. Most importantly, thousands of activities are interconnected in a complicated manner. This study proposes a method for analyzing the priority of activities for the reallocation of resources in order to reduce construction delay duration. The proposed method is composed of two steps: the prioritization of activities that can reduce construction duration and a reallocation of resources based upon that prioritization. First, in order to analyze priority, combinations of the lowest-cost activities for reducing per day are derived. Then, the importance of influence factors is analyzed, using the fuzzy analytic hierarchy process and fuzzy inference, and priority is derived based on the importance level. Next, the resources are reallocated based on the objective functions of maximizing the importance of the selected activities, reducing the duration, and minimizing the reducing cost. Decision-makers can compare between the reduction duration and available cost, and compare between results of the proposed method and the existing cost-slope method. Then, decision-makers can use the proposed method differently based on their own preferences toward economic and qualitative importance.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
选择高优先级的活动来重新分配资源,以减少建设时间
很难找出经济上可行的替代办法来缩短施工时间,因为在任何一个建筑项目中都存在许多重要因素,例如增加的建筑费用和奖励以及减少延误的违约金。最重要的是,成千上万的活动以一种复杂的方式相互关联。本研究提出了一种分析活动优先级的方法,用于资源的再分配,以减少施工延误时间。建议的方法由两个步骤组成:可以减少施工时间的活动的优先级和基于该优先级的资源重新分配。首先,为了分析优先级,导出了每天减少的最低成本活动的组合。然后,运用模糊层次分析法和模糊推理法对影响因素的重要程度进行分析,并根据重要程度确定优先级;其次,根据所选活动的重要性最大化、持续时间最小化和减少成本最小化的目标函数对资源进行重新分配。决策者可以将减少时间和可用成本进行比较,并将本文方法的结果与现有成本斜率法的结果进行比较。然后,决策者可以根据自己对经济和质量重要性的偏好不同地使用所提出的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
6.70
自引率
4.70%
发文量
0
审稿时长
1.7 months
期刊介绍: The Journal of Civil Engineering and Management is a peer-reviewed journal that provides an international forum for the dissemination of the latest original research, achievements and developments. We publish for researchers, designers, users and manufacturers in the different fields of civil engineering and management. The journal publishes original articles that present new information and reviews. Our objective is to provide essential information and new ideas to help improve civil engineering competency, efficiency and productivity in world markets. The Journal of Civil Engineering and Management publishes articles in the following fields: building materials and structures, structural mechanics and physics, geotechnical engineering, road and bridge engineering, urban engineering and economy, constructions technology, economy and management, information technologies in construction, fire protection, thermoinsulation and renovation of buildings, labour safety in construction.
期刊最新文献
INTEGRATING ENHANCED OPTIMIZATION WITH FINITE ELEMENT ANALYSIS FOR DESIGNING STEEL STRUCTURE WEIGHT UNDER MULTIPLE CONSTRAINTS RANDOM FIELD-BASED TUNNELING INFORMATION MODELING FRAMEWORK FOR PROBABILISTIC SAFETY ASSESSMENT OF SHIELD TUNNELS SHM-BASED PRACTICAL SAFETY EVALUATION AND VIBRATION CONTROL MODEL FOR STEEL PIPES STUDY OF THE INFLUENCE OF METRO LOADS ON THE DESTRUCTION OF NEARBY BUILDINGS AND CONSTRUCTION STRUCTURES USING BIM TECHNOLOGIES PERFORMANCE EVALUATION OF PALM OIL CLINKER AS CEMENT AND SAND REPLACEMENT MATERIALS IN FOAMED CONCRETE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1