{"title":"Critical project management success factors analysis for the construction industry of Bangladesh","authors":"Shuvo Dip Datta, Md. Habibur Rahman Sobuz, Mohammad Nafe Assafi, N. M. Sutan, Md. Nazrul Islam, Maria Binte Mannan, Abu Sayed Mohammad Akid, Noor Md. Sadiqul Hasan","doi":"10.1108/ijbpa-01-2022-0006","DOIUrl":null,"url":null,"abstract":"PurposeThis paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.Design/methodology/approachThis study identified 41 major problematic factors from the related literature. In this research, a detailed questionnaire survey was conducted among the experts and stakeholders of the construction industry of Bangladesh. The survey was carried out on a Likert scale and ranked the critical factors using the relative importance index (RII). The 41 problematic factors were divided into five group factors and ranked by the RII index to prioritize the factors. Finally, stakeholders' opinions were analyzed with the critical assessed factors, which was a very effective technique to eliminate the risks and uncertain occurrences in the construction industry of Bangladesh.FindingsThe factors analysis revealed that cost overrun, traffic jam, low wedges, slow payment for completed works and financial issues of the owner were leading critical factors in construction projects. Moreover, the critical factors are divided into five-factor groups, namely, financial management, monitoring and feedback, competency management, communication and coordination management, and risk management, which exhibit 0.767, 0.720, 0.711, 0.710 and 0.658 RII values. After all, the stakeholders' opinion suggested that implementing modern tools and techniques can help to avoid the critical situation in the construction industry of Bangladesh.Practical implicationsThe construction industry of Bangladesh is moving away from stable construction work day by day. Previously, the potential CSFs were discussed unstructured way. Hence, detecting early warning signals in a structured way has become necessary for the building firm's survival.Originality/valueThough some scattered critical issues are discussed in different literature, the critical issues of the Bangladeshi construction industry were not investigated extensively. Therefore, this study finds out the potential critical issues of the construction industry of Bangladesh to accumulate such harmful construction issues in a single platform so that the construction industry can have an overview of them with the help of innovative technologies.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2023-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Building Pathology and Adaptation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijbpa-01-2022-0006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 1
Abstract
PurposeThis paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.Design/methodology/approachThis study identified 41 major problematic factors from the related literature. In this research, a detailed questionnaire survey was conducted among the experts and stakeholders of the construction industry of Bangladesh. The survey was carried out on a Likert scale and ranked the critical factors using the relative importance index (RII). The 41 problematic factors were divided into five group factors and ranked by the RII index to prioritize the factors. Finally, stakeholders' opinions were analyzed with the critical assessed factors, which was a very effective technique to eliminate the risks and uncertain occurrences in the construction industry of Bangladesh.FindingsThe factors analysis revealed that cost overrun, traffic jam, low wedges, slow payment for completed works and financial issues of the owner were leading critical factors in construction projects. Moreover, the critical factors are divided into five-factor groups, namely, financial management, monitoring and feedback, competency management, communication and coordination management, and risk management, which exhibit 0.767, 0.720, 0.711, 0.710 and 0.658 RII values. After all, the stakeholders' opinion suggested that implementing modern tools and techniques can help to avoid the critical situation in the construction industry of Bangladesh.Practical implicationsThe construction industry of Bangladesh is moving away from stable construction work day by day. Previously, the potential CSFs were discussed unstructured way. Hence, detecting early warning signals in a structured way has become necessary for the building firm's survival.Originality/valueThough some scattered critical issues are discussed in different literature, the critical issues of the Bangladeshi construction industry were not investigated extensively. Therefore, this study finds out the potential critical issues of the construction industry of Bangladesh to accumulate such harmful construction issues in a single platform so that the construction industry can have an overview of them with the help of innovative technologies.
期刊介绍:
The International Journal of Building Pathology and Adaptation publishes findings on contemporary and original research towards sustaining, maintaining and managing existing buildings. The journal provides an interdisciplinary approach to the study of buildings, their performance and adaptation in order to develop appropriate technical and management solutions. This requires an holistic understanding of the complex interactions between the materials, components, occupants, design and environment, demanding the application and development of methodologies for diagnosis, prognosis and treatment in this multidisciplinary area. With rapid technological developments, a changing climate and more extreme weather, coupled with developing societal demands, the challenges to the professions responsible are complex and varied; solutions need to be rigorously researched and tested to navigate the dynamic context in which today''s buildings are to be sustained. Within this context, the scope and coverage of the journal incorporates the following indicative topics: • Behavioural and human responses • Building defects and prognosis • Building adaptation and retrofit • Building conservation and restoration • Building Information Modelling (BIM) • Building and planning regulations and legislation • Building technology • Conflict avoidance, management and disputes resolution • Digital information and communication technologies • Education and training • Environmental performance • Energy management • Health, safety and welfare issues • Healthy enclosures • Innovations and innovative technologies • Law and practice of dilapidation • Maintenance and refurbishment • Materials testing • Policy formulation and development • Project management • Resilience • Structural considerations • Surveying methodologies and techniques • Sustainability and climate change • Valuation and financial investment