S. Mai, Vatthanaly Siphada, Jianqiong Wang, Vinath Mekthanavanh, H. Hlaing, Pheng Sokliep
{"title":"Evaluating and classifying the impact of individual risk on the delayed EPC hydropower projects in the developing countries of Asia","authors":"S. Mai, Vatthanaly Siphada, Jianqiong Wang, Vinath Mekthanavanh, H. Hlaing, Pheng Sokliep","doi":"10.1504/IJRAM.2019.10022669","DOIUrl":null,"url":null,"abstract":"Many hydropower projects in the developing countries of Asia have currently adopted the project delivery method of engineering, procurement and construction (EPC). However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable cost overrun. The purpose of this research is to evaluate the risks causing schedule delays of EPC hydropower projects in the developing countries of Asia. The study analysis and assessment of risks is based on survey questionnaires, which achieved the follow findings: (1) there are 21 main risks influencing on schedule delays; (2) scientifically rank the influence of every single risk on schedule delays; (3) provide a recommendation that could reduce or eliminate these risks on schedule delay of EPC hydropower projects. This study provides a valuable reference which helps investors and contractors finish on schedule to ensure the benefits when building EPC hydropower projects in the developing countries of Asia.","PeriodicalId":35420,"journal":{"name":"International Journal of Risk Assessment and Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Risk Assessment and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJRAM.2019.10022669","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Decision Sciences","Score":null,"Total":0}
引用次数: 1
Abstract
Many hydropower projects in the developing countries of Asia have currently adopted the project delivery method of engineering, procurement and construction (EPC). However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable cost overrun. The purpose of this research is to evaluate the risks causing schedule delays of EPC hydropower projects in the developing countries of Asia. The study analysis and assessment of risks is based on survey questionnaires, which achieved the follow findings: (1) there are 21 main risks influencing on schedule delays; (2) scientifically rank the influence of every single risk on schedule delays; (3) provide a recommendation that could reduce or eliminate these risks on schedule delay of EPC hydropower projects. This study provides a valuable reference which helps investors and contractors finish on schedule to ensure the benefits when building EPC hydropower projects in the developing countries of Asia.
期刊介绍:
The IJRAM is an interdisciplinary and refereed journal that provides cross learning between: - Different business and economics, as well as scientific and technological, disciplines - Energy industries, environmental and ecological systems - Safety, public health and medical services - Software services, reliability and safety