Zdenka Bulková, J. Gašparík, M. Poliak, Lumír Pečený
{"title":"Technological Aspects of Tendering in Rail Passenger Transport in Slovakia","authors":"Zdenka Bulková, J. Gašparík, M. Poliak, Lumír Pečený","doi":"10.3311/pptr.20356","DOIUrl":null,"url":null,"abstract":"The market for rail services in EU countries has long been inaccessible to the private sector. Transport services were provided by national operators, which led to the prevention of participation in fair and non-discriminatory competition in the provision of rail transport services. It is necessary to analyse the overall development in the operation of rail passenger transport, including the entry of private operators into the rail infrastructure. Based on the knowledge of the current situation, it is necessary to take measures to achieve compliance with the requirements of Regulation (EC) No 1370/2007. The paper characterizes the current state and the process of organizing public tenders in the Slovak Republic based on a case study and their process and proposes the gradual steps of the public tender in the form of a schedule. An important point of the whole process of the organization of the public tender is the correct setting of competencies, determination of the subject of the public tender and to propose a uniform methodology of the public tender, which may, however, vary in individual states due to the conditions of national legislation. Part of the unified methodology is the determination of the phases of the public tender process, which are part of the schedule of the public tender. The schedule of the public tender shows the entire cycle, resp. the duration of each phase of the tender for each proposed group of measures taken.","PeriodicalId":39536,"journal":{"name":"Periodica Polytechnica Transportation Engineering","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Periodica Polytechnica Transportation Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/pptr.20356","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0
Abstract
The market for rail services in EU countries has long been inaccessible to the private sector. Transport services were provided by national operators, which led to the prevention of participation in fair and non-discriminatory competition in the provision of rail transport services. It is necessary to analyse the overall development in the operation of rail passenger transport, including the entry of private operators into the rail infrastructure. Based on the knowledge of the current situation, it is necessary to take measures to achieve compliance with the requirements of Regulation (EC) No 1370/2007. The paper characterizes the current state and the process of organizing public tenders in the Slovak Republic based on a case study and their process and proposes the gradual steps of the public tender in the form of a schedule. An important point of the whole process of the organization of the public tender is the correct setting of competencies, determination of the subject of the public tender and to propose a uniform methodology of the public tender, which may, however, vary in individual states due to the conditions of national legislation. Part of the unified methodology is the determination of the phases of the public tender process, which are part of the schedule of the public tender. The schedule of the public tender shows the entire cycle, resp. the duration of each phase of the tender for each proposed group of measures taken.
长期以来,私营部门一直无法进入欧盟国家的铁路服务市场。运输服务是由国家经营者提供的,这导致在提供铁路运输服务方面无法参与公平和非歧视的竞争。有必要分析铁路客运运营的整体发展,包括私营运营商进入铁路基础设施。根据对当前情况的了解,有必要采取措施以达到法规(EC) No 1370/2007的要求。本文以案例研究及其过程为基础,描述了斯洛伐克共和国组织公开招标的现状和过程,并以时间表的形式提出了公开招标的逐步步骤。在组织公开招标的整个过程中,重要的一点是正确设置投标能力,确定公开招标的主体,并提出统一的公开招标方法,然而,由于各国的立法条件,这种方法可能会有所不同。统一方法的一部分是确定公开招标过程的阶段,这是公开招标时间表的一部分。公开招标的时间表显示了整个周期,如:投标每一阶段所采取的每一组拟议措施的持续时间。
期刊介绍:
Periodica Polytechnica is a publisher of the Budapest University of Technology and Economics. It publishes seven international journals (Architecture, Chemical Engineering, Civil Engineering, Electrical Engineering, Mechanical Engineering, Social and Management Sciences, Transportation Engineering). The journals have free electronic versions.