A support vector machine model for due date assignment in manufacturing operations

IF 4 Q2 ENGINEERING, INDUSTRIAL Journal of Industrial and Production Engineering Pub Date : 2022-04-08 DOI:10.1080/21681015.2022.2059791
D. Dalalah, U. Ojiako, K. Alkhaledi, Alasdair Marshall
{"title":"A support vector machine model for due date assignment in manufacturing operations","authors":"D. Dalalah, U. Ojiako, K. Alkhaledi, Alasdair Marshall","doi":"10.1080/21681015.2022.2059791","DOIUrl":null,"url":null,"abstract":"ABSTRACT The relationship between product flow times and manufacturing system status is complex. This limits use of simple analytical functions for job shop manufacturing due date assigning, especially when dealing with orders involving multiple-resource manufacturing systems in receipt of random orders of different process plans. Our approach involves developing a Support Vector Machine classifier to articulate job shop manufacturing due date assigning in heterogeneous manufacturing environments. The emergent model allows not only for the complex relationships between flowtimes and manufacturing system status, but also for the prediction of random order flowtime of manufacturing systems with multiple resources. Our findings also suggest that service levels play a major role in negotiated due dates and eventual customer propensity to place manufacturing orders. In emphasizing negotiated due dates as against exogenous assigned due dates, the study focuses scholarly attention toward the need for participative, open and inclusive due date assignments. Graphical abstract","PeriodicalId":16024,"journal":{"name":"Journal of Industrial and Production Engineering","volume":"40 1","pages":"68 - 85"},"PeriodicalIF":4.0000,"publicationDate":"2022-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Industrial and Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/21681015.2022.2059791","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 2

Abstract

ABSTRACT The relationship between product flow times and manufacturing system status is complex. This limits use of simple analytical functions for job shop manufacturing due date assigning, especially when dealing with orders involving multiple-resource manufacturing systems in receipt of random orders of different process plans. Our approach involves developing a Support Vector Machine classifier to articulate job shop manufacturing due date assigning in heterogeneous manufacturing environments. The emergent model allows not only for the complex relationships between flowtimes and manufacturing system status, but also for the prediction of random order flowtime of manufacturing systems with multiple resources. Our findings also suggest that service levels play a major role in negotiated due dates and eventual customer propensity to place manufacturing orders. In emphasizing negotiated due dates as against exogenous assigned due dates, the study focuses scholarly attention toward the need for participative, open and inclusive due date assignments. Graphical abstract
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
制造作业中到期日分配的支持向量机模型
产品流动时间和制造系统状态之间的关系是复杂的。这限制了在车间制造截止日期分配中使用简单分析函数,尤其是在处理涉及多个资源制造系统的订单时,这些系统接收到不同工艺计划的随机订单。我们的方法涉及开发一个支持向量机分类器,以阐明异构制造环境中的车间制造截止日期分配。紧急模型不仅考虑了流程时间与制造系统状态之间的复杂关系,而且还考虑了具有多个资源的制造系统的随机订单流程时间的预测。我们的研究结果还表明,服务水平在协商的到期日和最终客户下制造订单的倾向中发挥着重要作用。在强调协商到期日相对于外生指定到期日时,该研究将学术注意力集中在参与性、开放性和包容性到期日作业的必要性上。图形摘要
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
7.50
自引率
6.70%
发文量
21
期刊最新文献
Workshop layout optimization method based on sparrow search algorithm: a new approach On the power and robustness of phase I nonparametric Shewhart-type charts using sequential normal scores Sustainable planning and design for eco-industrial parks using integrated multi-objective optimization and fuzzy analytic hierarchy process Analysis of the BP neural network comprehensive competitiveness evaluation model for the development evaluation of B2B E-commerce enterprises Financial management early warning model of enterprise circular economy based on chaotic particle swarm optimization algorithm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1