Allocating Remedial Expenditures at the East Helena Smelter Complex, MT USA

Q3 Environmental Science Environmental Claims Journal Pub Date : 2021-06-25 DOI:10.1080/10406026.2021.1892581
A. Davis, G. Evans, S. Benateigha, J. Clark
{"title":"Allocating Remedial Expenditures at the East Helena Smelter Complex, MT USA","authors":"A. Davis, G. Evans, S. Benateigha, J. Clark","doi":"10.1080/10406026.2021.1892581","DOIUrl":null,"url":null,"abstract":"Abstract The East Helena, MT lead smelter complex was operated from 1888 through 2001 by Asarco. An adjacent zinc smelter was run by Anaconda (now ARCO) from 1926 through 1972. Both operations contaminated groundwater that migrated offsite under East Helena. As part of their bankruptcy settlement, Asarco paid $111.4 M toward remediation of site soil and groundwater. ARCO denied any liability so Asarco sued ARCO for response costs, relying in part on historical documents, photographs and soil and groundwater chemistry in the vicinity of Anaconda’s zinc smelter. Based on expert analysis, the trial court determined that ARCO was liable for 25% of the $61.4 million actually spent. On appeal, the 25% allocation was upheld with the proviso that future costs may also be recovered after they are incurred.","PeriodicalId":11761,"journal":{"name":"Environmental Claims Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/10406026.2021.1892581","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environmental Claims Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10406026.2021.1892581","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract The East Helena, MT lead smelter complex was operated from 1888 through 2001 by Asarco. An adjacent zinc smelter was run by Anaconda (now ARCO) from 1926 through 1972. Both operations contaminated groundwater that migrated offsite under East Helena. As part of their bankruptcy settlement, Asarco paid $111.4 M toward remediation of site soil and groundwater. ARCO denied any liability so Asarco sued ARCO for response costs, relying in part on historical documents, photographs and soil and groundwater chemistry in the vicinity of Anaconda’s zinc smelter. Based on expert analysis, the trial court determined that ARCO was liable for 25% of the $61.4 million actually spent. On appeal, the 25% allocation was upheld with the proviso that future costs may also be recovered after they are incurred.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分配美国MT东海伦娜冶炼厂综合设施的补救开支
东海伦娜,MT铅冶炼厂综合体从1888年到2001年由Asarco运营。从1926年到1972年,毗邻的锌冶炼厂由阿纳康达公司(现为ARCO)经营。这两项操作都污染了东赫勒拿地下的地下水。作为破产和解协议的一部分,Asarco支付了1.114亿美元用于修复现场土壤和地下水。ARCO否认负有任何责任,因此Asarco起诉ARCO,要求赔偿赔偿费用,他们部分依据的是历史文件、照片以及阿纳康达锌冶炼厂附近的土壤和地下水化学成分。根据专家的分析,初审法院认定ARCO应承担实际花费的6140万美元中的25%。上诉后,25%的拨款维持不变,但附带条件是,未来的费用也可以在发生后收回。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Environmental Claims Journal
Environmental Claims Journal Environmental Science-Management, Monitoring, Policy and Law
CiteScore
2.20
自引率
0.00%
发文量
10
期刊介绍: The Environmental Claims Journal is a quarterly journal that focuses on the many types of claims and liabilities that result from environmental exposures. The ECJ considers environmental claims under older business insurance policies, coverage and claims under more recent environmental insurance policies, as well as toxic tort claims. Exposures and claims from all environmental media are considered: air, drinking water, groundwater, soil, chemicals in commerce and naturally occurring chemicals. The journal also considers the laws, regulations, and case law that form the basis for claims. The journal would be of interest to environmental and insurance attorneys, insurance professionals, claims professionals, and environmental consultants.
期刊最新文献
Adsorption Removal of Azo Dye (Methylene Blue) From Wastewater Using Biomaterials with Kinetic Modeling Environmental Impacts of Emissions Streams Within the Ironmaking in Understanding SO X and NO X Formation Using Factsage Software The Just Transition: Retrofit Decarbonization with Modular Nuclear Determination of Sustainable Factors in Green Supply Chain Management With the Adoption of Green Logistics in the Manufacturing Industry Local Climate Action Planning – The Land Use Perspective
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1