Comparative Analysis of Windings and Vector Groups in 20/0.4 kV Distribution Transformers at CV. Centrado Prima

Taopik Hidayat, Brainvendra Widi Dionova, Sinka Wilyanti, M. N. Mohammed
{"title":"Comparative Analysis of Windings and Vector Groups in 20/0.4 kV Distribution Transformers at CV. Centrado Prima","authors":"Taopik Hidayat, Brainvendra Widi Dionova, Sinka Wilyanti, M. N. Mohammed","doi":"10.32497/eksergi.v18i3.3765","DOIUrl":null,"url":null,"abstract":"Turn ratio test is a comparison test of the number of secondary turns with the primary turns on the transformer. The turns ratio and group vector testing is one of the routine transformer tests. This test generally uses the Transformer Turns Ratio (TTR) test tool, the test equipment used sometimes experiences technical and non-technical problems so a comparative test method is needed to get a good analysis. The research method used is observational research and literature study, namely analyzing the transformer to be studied by conducting TTR testing in two ways, namely testing with test equipment and three-phase low voltage sources, aiming to obtain a very good level of accuracy. The test results were analyzed and compared with theory and calculations, with reference to the IEC 60076-1 standard. The results of the comparison of windings and group vectors using TTR 100 test equipment and a 3-phase low voltage source (TVR) show the same conclusions as the results of the analysis, where the first transformer sample is in normal condition and meets the requirements. SPLN D3.002-1:2007 or IEC Standard 60076-1. While the second sample transformer is in an abnormal condition in the W winding where the difference value is above 0.5%.<script id=\"stacks-wallet-provider\" type=\"text/javascript\" src=\"chrome-extension://ldinpeekobnhjjdofggfgjlcehhmanlj/inpage.js\"></script><script id=\"stacks-wallet-provider\" type=\"text/javascript\" src=\"chrome-extension://ldinpeekobnhjjdofggfgjlcehhmanlj/inpage.js\"></script><script id=\"stacks-wallet-provider\" type=\"text/javascript\" src=\"chrome-extension://ldinpeekobnhjjdofggfgjlcehhmanlj/inpage.js\"></script><script id=\"stacks-wallet-provider\" type=\"text/javascript\" src=\"chrome-extension://ldinpeekobnhjjdofggfgjlcehhmanlj/inpage.js\"></script><script id=\"stacks-wallet-provider\" type=\"text/javascript\" src=\"chrome-extension://ldinpeekobnhjjdofggfgjlcehhmanlj/inpage.js\"></script><script id=\"stacks-wallet-provider\" type=\"text/javascript\" src=\"chrome-extension://ldinpeekobnhjjdofggfgjlcehhmanlj/inpage.js\"></script><script id=\"stacks-wallet-provider\" type=\"text/javascript\" src=\"chrome-extension://ldinpeekobnhjjdofggfgjlcehhmanlj/inpage.js\"></script>","PeriodicalId":30703,"journal":{"name":"Eksergi","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eksergi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32497/eksergi.v18i3.3765","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Turn ratio test is a comparison test of the number of secondary turns with the primary turns on the transformer. The turns ratio and group vector testing is one of the routine transformer tests. This test generally uses the Transformer Turns Ratio (TTR) test tool, the test equipment used sometimes experiences technical and non-technical problems so a comparative test method is needed to get a good analysis. The research method used is observational research and literature study, namely analyzing the transformer to be studied by conducting TTR testing in two ways, namely testing with test equipment and three-phase low voltage sources, aiming to obtain a very good level of accuracy. The test results were analyzed and compared with theory and calculations, with reference to the IEC 60076-1 standard. The results of the comparison of windings and group vectors using TTR 100 test equipment and a 3-phase low voltage source (TVR) show the same conclusions as the results of the analysis, where the first transformer sample is in normal condition and meets the requirements. SPLN D3.002-1:2007 or IEC Standard 60076-1. While the second sample transformer is in an abnormal condition in the W winding where the difference value is above 0.5%.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
20/0.4 kV配电变压器绕组和矢量组的比较分析。Centrado首席
匝数比试验是变压器二次匝数与一次匝数的比较试验。匝比和群矢量试验是变压器的常规试验之一。本试验一般采用变压器匝比(TTR)试验工具,所使用的试验设备有时会遇到技术和非技术问题,因此需要一种比较试验的方法来得到很好的分析。研究方法为观察研究法和文献研究法,即通过TTR测试对待研究变压器进行分析,采用测试设备测试和三相低压源测试两种方式进行TTR测试,目的是获得非常好的准确度。参考IEC 60076-1标准,对试验结果进行了理论和计算分析比较。使用ttr100测试设备和三相低压源(TVR)对绕组和群矢量进行比较的结果与分析结果一致,其中第一个变压器样品状态正常,满足要求。SPLN D3.002-1:2007或IEC标准60076-1。而第二个样品变压器在W绕组异常,差值在0.5%以上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
4 weeks
期刊最新文献
Studi Efektivitas Pemanfaatan Arang Aktif Cangkang Kelapa Sawit (Elaeis guineensis) Sebagai Adsorben Pengurangan Kadar Amonia Limbah Cair Tahu Efisiensi Thermal Alat Economizer pada Pre-Treatment Section dalam Pengolahan Crude Palm Oil (CPO) Effect of Chitosan-TiO2 Membrane Performance for the Degradation of Batik Waste with a Photocatalytic Hybrid System Kinetika Produksi Selulosa Bakteri dari Limbah Kulit Pisang Optimasi Komposisi MDEA dan MEA Sebagai Absorbent untuk Proses Penghilangan CO2 dalam Produksi Gas di Lapangan A
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1